家裝合同書(shū)范文
時(shí)間:2023-03-21 17:13:46
導(dǎo)語(yǔ):如何才能寫(xiě)好一篇家裝合同書(shū),這就需要搜集整理更多的資料和文獻(xiàn),歡迎閱讀由公文云整理的十篇范文,供你借鑒。

篇1
住所:______________________ 電話:____________ 傳真:____________
委托人:________________________電話:____________ 傳真:____________
承包人(乙方):________________________
住所:______________________ 電話:____________ 傳真:____________
法定代表人:________________________ 電話:____________
本工程設(shè)計(jì)人:________________________ 電話:____________
施工隊(duì)負(fù)責(zé)人:________________________電話:____________
依照《中華人民共和國(guó)合同法》及有關(guān)法律、法規(guī)的規(guī)定,甲乙雙方在平等、自愿、協(xié)商一致的基礎(chǔ)上,就發(fā)包人的家庭居室內(nèi)裝飾裝修有關(guān)事宜(以下稱工程),達(dá)成如下協(xié)議:
第一條 工程概況
1. 工程名稱:__________________________________。
2、工程地點(diǎn):__________________________________ 。
3、承包范圍:參見(jiàn)合同附件之預(yù)算表。
4、工程承包方式:雙方商定采取下列第____________ 種承包方式:
(1)承包人包工、包料;
(2)承包人包工、包部分輔料,發(fā)包人提供裝修主要材料;
(3)承包人包工、發(fā)包人包料。
(附件即經(jīng)雙方當(dāng)事人簽字確認(rèn)的《承包人/發(fā)包人提供裝飾裝修材料明細(xì)表》。)
第二條 施工圖紙
雙方施工圖采取下列第____________ 種方式提供:
(1)發(fā)包人自行設(shè)計(jì)并提供施工圖紙,圖紙一式二份,發(fā)包人、承包人各一份;
(2)發(fā)包人委托承包人設(shè)計(jì)施工圖紙,設(shè)計(jì)費(fèi)(大寫(xiě))____________ 元,由發(fā)包人支付(此費(fèi)用不在工程價(jià)款內(nèi))。
施工圖紙經(jīng)甲乙雙方確認(rèn)后,提供方應(yīng)當(dāng)負(fù)責(zé)在約定的開(kāi)工日期前____________內(nèi)取得有關(guān)部門(mén)確認(rèn)或者批準(zhǔn)。
施工圖紙一式二份,甲乙雙方各持一份,作為本合同的附件。
第三條 甲方工作
1、開(kāi)工前 天,全部騰空或部分騰空房屋,清除障礙物(合同已經(jīng)包清理的除外),對(duì)未能全部騰空的房屋的家具和陳設(shè)采取保護(hù)措施,為承包人進(jìn)場(chǎng)做好準(zhǔn)備工作。
2、辦理工程施工所需要的各種申請(qǐng)、批件等手續(xù),保證乙方能夠順利進(jìn)場(chǎng)施工,除法律、法規(guī)和規(guī)章規(guī)定應(yīng)當(dāng)由乙方辦理的手續(xù)外。
3、提供符合施工要求的水源、電源,負(fù)責(zé)協(xié)調(diào)鄰里及管理機(jī)構(gòu)之間的關(guān)系。
4、參與工程質(zhì)量和施工進(jìn)度的監(jiān)督,負(fù)責(zé)材料進(jìn)場(chǎng)、竣工驗(yàn)收確認(rèn)工作。
5、施工期間仍然需要部分使用該房屋的,應(yīng)當(dāng)負(fù)責(zé)做好施工現(xiàn)場(chǎng)的保護(hù)等工作,應(yīng)當(dāng)注意為施工提供各種便利條件。
6、按照約定的期限支付工程費(fèi),依據(jù)規(guī)定交納應(yīng)由其承擔(dān)的各種稅費(fèi)。
第四條 乙方工作
1. 參加有關(guān)施工圖紙或作法說(shuō)明會(huì)議或現(xiàn)場(chǎng)交底,擬定施工方案和計(jì)劃交甲方審定確認(rèn)。
2. 施工中嚴(yán)格執(zhí)行安全施工掃做規(guī)范、防火規(guī)定、施工規(guī)范及質(zhì)量標(biāo)準(zhǔn),按期保質(zhì)完成工程。
3. 未經(jīng)甲方同意或有關(guān)部門(mén)批準(zhǔn),不得隨意拆改原建筑物結(jié)構(gòu)及各種設(shè)備管線。
4. 保護(hù)好原居室室內(nèi)的家具、陳設(shè)及水電管線的完好,保證居室內(nèi)上、下水管道的通暢。
5. 對(duì)于施工過(guò)程中的有關(guān)事項(xiàng)(如材料的進(jìn)場(chǎng)、隱蔽工程的驗(yàn)收、竣工驗(yàn)收等)需要甲方確認(rèn)的,應(yīng)當(dāng)及時(shí)并給予其必要的準(zhǔn)備時(shí)間。
6. 嚴(yán)格執(zhí)行有關(guān)施工現(xiàn)場(chǎng)管理的規(guī)定,不得擾民及污染環(huán)境;保證施工現(xiàn)場(chǎng)的整潔,工程完工后負(fù)責(zé)清掃施工現(xiàn)場(chǎng)。
7. 工程竣工前未移交甲方之前,負(fù)責(zé)對(duì)現(xiàn)場(chǎng)的設(shè)施和工程成品進(jìn)行保護(hù)。
第五條 關(guān)于工期
1. 工程期限____________ 天,開(kāi)工日期 年____________ 月____________日,竣工日期 年 月 日。
2. 因甲方及其人(代表)原因(物料供應(yīng)不及時(shí)、不按期支付工程款等)導(dǎo)致工期延誤的,工期順延。因乙方及其人(代表)原因?qū)е鹿て谘诱`的,工期不予順延。
3. 因?yàn)槿缦乱蛩赜绊懚鴮?dǎo)致不能完成工作的,工期順延,雙方互不承擔(dān)責(zé)任:
(1)遭遇嚴(yán)重影響施工的惡劣天氣、停水、停電、天災(zāi)、戰(zhàn)爭(zhēng)、暴亂等不可抗力的;
(2)經(jīng)雙方同意的工程量變化和設(shè)計(jì)變更;
(3)因與甲方和乙方無(wú)關(guān)的第三方的原因造成工程延誤,第三方因素包括但不限于所在地(小)區(qū)的管理機(jī)構(gòu)和隔壁鄰居的無(wú)理行為;
(4)經(jīng)甲方同意的屬新材料或新工藝采用而導(dǎo)致的工期拖延或試驗(yàn)時(shí)間浪費(fèi);
(5)經(jīng)甲乙雙方同意工期順延的其他情況。
第六條 關(guān)于材料供應(yīng)和保管
1. 任何一方負(fù)責(zé)提供的材料和設(shè)備,均須是符合法律、法規(guī)規(guī)定的合格產(chǎn)品,還必須符合本合同約定的標(biāo)準(zhǔn)和設(shè)計(jì)的要求。提供方應(yīng)將材料和設(shè)備按時(shí)、按量運(yùn)送到施工現(xiàn)場(chǎng),并通知對(duì)方當(dāng)事人驗(yàn)收簽字確認(rèn)。
2. 對(duì)一方提供的任何材料和設(shè)備,如不符質(zhì)量要求或規(guī)格有差異的,對(duì)方有權(quán)要求更換,提供方應(yīng)當(dāng)予以更換。由此造成的費(fèi)用增加部分,有提供方承擔(dān)。
3. 材料和設(shè)備進(jìn)場(chǎng)后,統(tǒng)一由乙方負(fù)責(zé)保管和使用,如因保管不善或者使用不當(dāng)造成的不必要的浪費(fèi)、損壞或者丟失,應(yīng)當(dāng)由乙方負(fù)責(zé),施工過(guò)程中的正常消耗除外。
第七條 關(guān)于質(zhì)量和驗(yàn)收
1. 工程以施工圖紙、作法說(shuō)明、設(shè)計(jì)變更和中華人民共和國(guó)國(guó)家標(biāo)準(zhǔn)《住宅裝飾裝修工程施工規(guī)范》(gb 50327-2001)為質(zhì)量評(píng)定驗(yàn)收標(biāo)準(zhǔn)。
2. 甲、乙方雙方應(yīng)及時(shí)辦理隱蔽工程和中間工程的檢查、驗(yàn)收手續(xù);甲方不按時(shí)參加驗(yàn)收的,工期應(yīng)予順延。
3. 由于甲方擅自指揮乙方所屬人員或第三方人員進(jìn)行施工所導(dǎo)致的工程質(zhì)量,由甲方自行負(fù)責(zé)。由乙方負(fù)責(zé)返工的,返工費(fèi)用由甲方負(fù)責(zé)。
4. 工程竣工后,乙方應(yīng)通知甲方驗(yàn)收,甲方應(yīng)當(dāng)自接到驗(yàn)收通知后 天內(nèi)組織驗(yàn)收,并辦理驗(yàn)收移交手續(xù)。
5. 驗(yàn)收時(shí),工程項(xiàng)目合格率達(dá)到____________ %時(shí)(以上程價(jià)款比例為準(zhǔn)),其他不合格項(xiàng)目(不包括工程項(xiàng)目未完成或成品程序未完成的項(xiàng)目)的維修或返工不影響竣工日期的確立,甲方對(duì)此應(yīng)予以確認(rèn)。
6. 乙方承諾自竣工日期起,為工程項(xiàng)目保修 年。損耗品、使用不當(dāng)、人為破壞以及非工程自身原因的損壞不在保修范圍。國(guó)家
行政部門(mén)或者行業(yè)機(jī)構(gòu)在本合同簽署生效之前已經(jīng)對(duì)個(gè)別的工程項(xiàng)目或材料有特定保修年限或豁免保修的,以國(guó)家行政部門(mén)或者行業(yè)機(jī)構(gòu)的規(guī)定為準(zhǔn)。 7. 甲乙兩方約定的其他保修或免保修情況:__________________________________
____________________________________________________________________ 。
8. 工程未驗(yàn)收的,甲方不得先行使用。
第八條 關(guān)于工程價(jià)款及結(jié)算
1. 雙方約定按以下第____________ 種方式支付工程款:
(1)合同生效后,發(fā)包人按下表中的約定,直接向承包人支付工程款:
支付次數(shù)____________ 支付階段或時(shí)間____________ 支付金額
第一次______________________ 支付____________ 元;
第二次______________________ 支付____________ 元;
第三次______________________ 支付____________ 元;
第四次____________ 工程驗(yàn)收后 天 工程總造價(jià)的5%,約____________ 元。
(2)其他支付方式:______________________ 。
2. 雙方同意工程的結(jié)算方法按下列第____________ 種進(jìn)行結(jié)算:
(1)固定價(jià)格,本工程總價(jià)款為_(kāi)___________元;
(2)單價(jià)不變,按實(shí)際數(shù)量加損耗率計(jì)算,但是總價(jià)不得超過(guò)____________ 元。
a. 乳膠漆和油漆類(lèi)為:墻面面積(減門(mén)不減窗)+頂面面積+6%X拼花部分面積;
b. 瓷磚面積為:實(shí)際面積+6%X實(shí)際面積;
c. 實(shí)木地板面積為:實(shí)際面積+6%X實(shí)際面積,拼花部分面積+10%X拼花部分面積;
d. 木工衣柜類(lèi)面積為:實(shí)際面積(平方米取整數(shù)值,小數(shù)位不夠0.5平方米按0.5平方米計(jì)算,超出0.5平方米的按1平方米計(jì)算);
e. 其他按項(xiàng)項(xiàng)目按項(xiàng)計(jì)算;
f. 其他按平方米計(jì)算的項(xiàng)目為:實(shí)際面積+6%X實(shí)際面積;
g. 估價(jià)項(xiàng)目測(cè)量后再具體報(bào)價(jià);
h. 經(jīng)甲方同意代購(gòu)的項(xiàng)目按預(yù)算內(nèi)造價(jià)購(gòu)買(mǎi),經(jīng)甲方同意可以調(diào)整。
3. 特別費(fèi)用的約定:
(1)施工過(guò)程中,施工現(xiàn)場(chǎng)發(fā)生的一切水電費(fèi)用由甲方負(fù)責(zé)。
(2)施工過(guò)程中,因?yàn)橐曳降囊蛩剡`規(guī)被執(zhí)法機(jī)構(gòu)或管理機(jī)構(gòu)罰款的,罰款由乙方支付;如乙方行為是在甲方強(qiáng)行要求或者指揮下發(fā)生的,罰款由甲方負(fù)責(zé)。
(3)合同附件預(yù)算表中沒(méi)有列明稅費(fèi),稅費(fèi)由甲方按實(shí)際征稅額向有關(guān)部門(mén)交納;已經(jīng)列明稅費(fèi)的,由乙方負(fù)責(zé)繳交。
(4)物業(yè)管理機(jī)構(gòu)收取超過(guò)正常的物業(yè)小區(qū)內(nèi)運(yùn)輸費(fèi)用的,由甲方負(fù)責(zé)交涉或向乙方補(bǔ)貼差額。
4. 乙方按雙方簽署的預(yù)算附件項(xiàng)目執(zhí)行。如甲方增加新的工程項(xiàng)目,另行簽署合同。其中涉及款項(xiàng),甲方應(yīng)按預(yù)付50%、項(xiàng)目完工50%的辦法在工程驗(yàn)收前支付給乙方。如其中物料款項(xiàng)大于該項(xiàng)目的50%,則甲方應(yīng)按實(shí)際比例先支付給乙方備料。
5. 工程驗(yàn)收合格后,乙方應(yīng)將有關(guān)資料送交甲方,雙方進(jìn)行工程結(jié)算。發(fā)包人接到資料后 天內(nèi)未有異議,即視為同意按照該資料進(jìn)行工程結(jié)算,雙方應(yīng)填寫(xiě)工程結(jié)算單并簽字,甲方應(yīng)按照前述期限約定付清乙方工程款。
第九條 工程預(yù)算文件(表)屬于本合同附件,所列工程項(xiàng)目除經(jīng)過(guò)甲乙雙方同意外,不得隨意添加、更改、刪除。
第十條 責(zé)任與罰則
1. 施工調(diào)度、安全管理等事務(wù)由乙方負(fù)責(zé),其他人事包括甲方均不得無(wú)理干涉。甲方擅自指揮工人或親自進(jìn)行任何操作,由此引起的損失和事故由甲方負(fù)全責(zé)。
2. 因乙方及其人(代表)的原因造成工期延誤的,每拖延一天,應(yīng)向甲方支付____________ 的違約金。
3. 因甲方及其人(代表)的原因造成工期延誤的,應(yīng)當(dāng)賠償乙方因此造成的人工費(fèi)損失。
4. 甲方不能按照前述約定期限足額支付乙方工程款的,應(yīng)當(dāng)按照____________ 支付乙方延期付款違約金。
5. 未辦理驗(yàn)收手續(xù),甲方提前使用或擅自動(dòng)用工程成品而造成損失的,由其自行負(fù)責(zé)。
6. 因一方原因,造成合同無(wú)法繼續(xù)履行時(shí),該方應(yīng)及時(shí)通知另一方,辦理合同終止手續(xù),并由責(zé)任方賠償對(duì)方相應(yīng)的經(jīng)濟(jì)損失。
7. 乙方在遭遇不可抗力影響施工的,應(yīng)當(dāng)及時(shí)采取措施避免損失擴(kuò)大,并將有關(guān)情況通知甲方。否則,應(yīng)當(dāng)對(duì)造成的損失擴(kuò)大部分承擔(dān)賠償責(zé)任。
第十一條 雙方如對(duì)合同的執(zhí)行發(fā)生爭(zhēng)議,應(yīng)友好協(xié)商解決:協(xié)商無(wú)效的,可提交人民法院訴訟。
第十二條 附 則
1. 本合同一式兩份,雙方個(gè)執(zhí)一份,同具法律效力。
2. 本合同履行完成后自動(dòng)終止。
甲方(簽字):________________________ 乙方公司(蓋章):____________
現(xiàn)場(chǎng)代表(簽字):___________________ 現(xiàn)場(chǎng)代表(簽字): ____________
證件名稱:______________________ 證件名稱:______________________
頒發(fā)機(jī)構(gòu):______________________ 頒發(fā)機(jī)構(gòu):______________________
證件號(hào)碼:______________________ 證件號(hào)碼:______________________
篇2
甲方:中國(guó)_________公司
法定地址:_________
電話:_________
電傳:_________
乙方:_________國(guó)_________公司
法定地址:_________
電話:_________
電傳:_________
雙方在平等互利基礎(chǔ)上,通過(guò)友好協(xié)商,特訂立本合同。
第一條 貿(mào)易內(nèi)容
(一)乙方同意按甲方在合同中提出的嚴(yán)格標(biāo)準(zhǔn)和規(guī)格,用甲方提供的原料生產(chǎn)甲方指定的產(chǎn)品。
(二)加工成品名稱和數(shù)量
1.成品名稱:_________。
2.成品數(shù)量:_________。
第二條 加工成品規(guī)格
根據(jù)乙方提供的設(shè)計(jì)原型,圖紙與產(chǎn)品樣品,甲乙雙方共同制定規(guī)范,以滿足生產(chǎn)的需要,這種規(guī)范要符合加工成品的質(zhì)量和性能標(biāo)準(zhǔn)。此規(guī)范一經(jīng)雙方確定,任何變動(dòng)只有依雙方書(shū)面協(xié)議修改。
第三條 原材料供應(yīng)
(一)本協(xié)議期間,最遲在每個(gè)公歷季度前_________月,甲方應(yīng)向乙方提供該季度甲方定貨所需的生產(chǎn)原材料和消耗材料。
(二)乙方收到甲方提供的原材料后,應(yīng)按甲方指定的檢查方法立即對(duì)原材料進(jìn)行檢查,并將其結(jié)果在檢查完畢后_________天內(nèi)向甲方報(bào)告。不符合甲方規(guī)格要求的原材料不能用來(lái)生產(chǎn)指定產(chǎn)品。
第四條 加工費(fèi)
(一)加工單價(jià)
1._________型_________美元/個(gè)
2._________
(二)生產(chǎn)指定產(chǎn)品的加工費(fèi)應(yīng)該按上述價(jià)格執(zhí)行并在第一個(gè)_________年期內(nèi)不變。在此_________年期后,乙方可在不少于_________是給甲方以書(shū)面通知,以求改變加工費(fèi)。如果甲方接到改變加工費(fèi)的通知后_________月內(nèi)不作改變,此協(xié)議可以終止。
第五條 支付條款
關(guān)于加工費(fèi)的支付、甲方至少應(yīng)在每次完工的貨物裝船_________天以前,由經(jīng)乙方認(rèn)可的銀行開(kāi)立以乙方為受益人,金額足以支付裝船貨物的保兌的不可撤銷(xiāo)的信用證。該信用證憑乙方的商業(yè)發(fā)票、全套提單、裝箱單和商檢證明議付。
第六條 技術(shù)資料和技術(shù)服務(wù)
(一)乙方同意向甲方提供組裝加工成品所需的圖紙,說(shuō)明書(shū)及成品測(cè)試、檢查標(biāo)準(zhǔn)等。
(二)甲方同意對(duì)乙方在加工裝配技術(shù)方面的質(zhì)疑予以適當(dāng)解答。
(三)在合同有效期內(nèi),根據(jù)乙方請(qǐng)求,乙方同意派遣其工程技術(shù)人員到乙方工廠進(jìn)行與加工裝配有關(guān)的技術(shù)指導(dǎo)。甲方派遣工程技術(shù)人員的所有旅行費(fèi)用和生活費(fèi)用將由乙方承擔(dān)。
(四)在合同有效期內(nèi),根據(jù)乙方請(qǐng)求,甲方同意乙方人員到甲方工廠接受有關(guān)加工裝配的技術(shù)培訓(xùn)。但乙方每次派遣人數(shù)不得超過(guò)_________人,停留時(shí)間不得超過(guò)_________天。乙方派遣人員的所有旅行費(fèi)用和生活費(fèi)用將由乙方承擔(dān)。
第七條 質(zhì)量控制和檢測(cè)
(一)生產(chǎn)的成品應(yīng)由甲方指定的人或檢驗(yàn)人進(jìn)行檢驗(yàn),證明產(chǎn)品與甲方指定的質(zhì)量標(biāo)準(zhǔn)和規(guī)范一致。
(二)如果出現(xiàn)產(chǎn)品不符合甲方標(biāo)準(zhǔn)的情況,甲方可拒絕收貨。但,甲方可根據(jù)甲乙雙方視每次具體情況的折扣議價(jià)予以接受。
(三)乙方為甲方生產(chǎn)的產(chǎn)品至少應(yīng)與目前第三者銷(xiāo)售的類(lèi)似產(chǎn)品質(zhì)量相同。合同期間所有影響產(chǎn)品質(zhì)量、規(guī)格的改變應(yīng)在這種改變運(yùn)用于產(chǎn)品之前_________天通知甲方。甲方為充分服務(wù)市場(chǎng)的目的,可隨時(shí)建議改變或改進(jìn)產(chǎn)品,乙方應(yīng)真誠(chéng)地考慮采納這些改變或改進(jìn)的意見(jiàn)。
第八條 包裝與標(biāo)記
產(chǎn)品要嚴(yán)格按照甲方的指示和出口貨物商品常規(guī)進(jìn)行合適包裝。包裝要嚴(yán)格按甲方指示注明標(biāo)記。甲方應(yīng)至少在貨物完工交運(yùn)前_________天給乙方標(biāo)記指示。在cfr和cif條件下,乙方應(yīng)在裝船期前_________天內(nèi)將船只、船籍、船齡用電傳/傳真方式通知甲方。在未得甲方確認(rèn)時(shí),裝運(yùn)不得進(jìn)行。甲方應(yīng)在_________工作日內(nèi)予以確認(rèn),否則即認(rèn)為船只得到認(rèn)可。
第九條 裝運(yùn)及交貨
在cfr和cif條件下,乙方應(yīng)在裝船期前_________天內(nèi)將船名、船籍、船齡用電傳/傳真方式通知甲方。在未得到甲方通知時(shí),裝運(yùn)不得進(jìn)行。甲方應(yīng)在_________工作日內(nèi)予以確認(rèn),否則即認(rèn)為船只得到認(rèn)可。在fob條件下,由甲方負(fù)責(zé)按照合同規(guī)定的交貨日期洽定艙位。乙方應(yīng)在合同規(guī)定的裝船期前_________日將合同號(hào)、貨物名稱、數(shù)量、金額、箱數(shù)、總重量、總體積及貨物在裝運(yùn)港備妥待運(yùn)的日期以電傳/傳真方式通知甲方。甲方應(yīng)在裝船期前_________日通知乙方船號(hào)、預(yù)計(jì)裝船日期、合同號(hào),以便乙方安排裝運(yùn)。如果有必要改變裝運(yùn)船只達(dá)日期,甲方或其運(yùn)輸應(yīng)及時(shí)通知乙方。如船只不能在甲方通知的船期后_________日內(nèi)到達(dá)裝運(yùn)港,甲方應(yīng)承擔(dān)從第_________之日起發(fā)生的貨物倉(cāng)儲(chǔ)保管費(fèi)用。船只到達(dá)預(yù)定裝運(yùn)港時(shí),乙方如未按時(shí)將要裝載的貨物如約備足,則應(yīng)承擔(dān)空艙費(fèi)或滯期費(fèi)。在fob、cfr和cif條件下,乙方在貨物裝船完畢后立即以電傳/傳真方式向甲方發(fā)出裝船通知。裝船通知應(yīng)包括合同號(hào)、貨物名稱、數(shù)量、毛重量、包裝尺碼、發(fā)票金額、提單號(hào)碼、啟航日期。
第十條 料件耗用
在加工裝配過(guò)程中的料件耗用率為_(kāi)________%。料件耗用率低于_________%,甲方將免費(fèi)補(bǔ)充提供已耗用的料件。如料件耗用率超過(guò)_________%,乙方將承擔(dān)補(bǔ)充耗用料件所發(fā)生的一切費(fèi)用。
第十一條 所有權(quán)和風(fēng)險(xiǎn)轉(zhuǎn)移
甲方交給乙方的原材料和用此生產(chǎn)的產(chǎn)品所有權(quán)、原材料或產(chǎn)品丟失的或損壞的風(fēng)險(xiǎn),全部歸甲方。不過(guò),從乙方收到運(yùn)來(lái)的材料起至交付產(chǎn)品給甲方時(shí)止,乙方經(jīng)甲方同意,用甲方的費(fèi)用,在保險(xiǎn)公司就貨物的各種損壞、毀滅和丟失購(gòu)買(mǎi)的全值保險(xiǎn),甲方應(yīng)為此保險(xiǎn)的收益人。
第十二條 不可抗力
任何一方對(duì)由于下列原因而導(dǎo)致不能或暫時(shí)不能履行全部或部分合同義務(wù)的,不負(fù)責(zé)任:水災(zāi)、火災(zāi)、地震、干旱、戰(zhàn)爭(zhēng)或其他任何雙方在簽約時(shí)不能預(yù)料、無(wú)法控制且不能避免和克服的事件。但不可抗力影響的一方,應(yīng)盡快地將所發(fā)生的事件通知對(duì)方,并應(yīng)在事件發(fā)生后15天內(nèi)將有關(guān)機(jī)構(gòu)出具的不可抗力事件的證明寄交對(duì)方。如果不可抗力事件之影響超過(guò)122天,雙方應(yīng)協(xié)商合同繼續(xù)履行或終止履行的事宜。
第十三條 仲裁
對(duì)于因履行本合同發(fā)生的一切爭(zhēng)議,雙方應(yīng)友好協(xié)商解決,如協(xié)商無(wú)法解決爭(zhēng)議,則應(yīng)將爭(zhēng)議提交中國(guó)國(guó)際經(jīng)濟(jì)仲裁委員會(huì)(北京),依據(jù)其仲裁規(guī)則進(jìn)行仲裁。仲裁裁決是終局的,對(duì)雙方都有約束力。仲裁費(fèi)用應(yīng)由敗訴一方承擔(dān),但仲裁委員會(huì)另有裁定的除外。
第十四條 合同有效期
本合同自雙方簽字之日起生效,有效期_________年。
第十五條 合同修改對(duì)本合同的修改,必須對(duì)甲、乙雙方簽署書(shū)面協(xié)議才能成立。
第十六條 文字
本合同用中文和_________文寫(xiě)成,兩種文本具有同等效力。上述兩種文本如有不符,以中文本為準(zhǔn)。
甲方(蓋章):_________乙方(蓋章):_________
篇3
家庭水電安裝合同書(shū)范文1甲方:
乙方:
本著互相信任的原則,就甲方的水電工程達(dá)成以下協(xié)議。 第一、工程概況
1.工程名稱:辦公樓
2.承包范圍:整個(gè)工程的水電安裝調(diào)試
第二條 材料供應(yīng)的約定
1.甲方提供的材料,乙方必須至少提前三天向甲方提出下一工序需要購(gòu)買(mǎi)的材料的清單,并注明所需要材料的數(shù)量。甲方應(yīng)按時(shí)提供乙方需要的材料。
2. 乙方自帶施工的必須工具(錐子、切割片等),要保證安全性、良好使用性,乙方自行承擔(dān)工具維修費(fèi)和損耗費(fèi)用。
第三條 關(guān)于工程質(zhì)量及驗(yàn)收的約定
1.嚴(yán)格按圖紙施工,由于乙方施工技術(shù)差及責(zé)任心不到位等自身原因造成質(zhì)量問(wèn)題,其返工費(fèi)用由乙方承擔(dān)。
2.工程竣工:乙方應(yīng)提前兩天通知甲方驗(yàn)收,甲方在接到通知兩日內(nèi)組織驗(yàn)收,并辦理驗(yàn)收手續(xù)。
第四條 有關(guān)安全的現(xiàn)場(chǎng)管理約定:
1.進(jìn)入施工現(xiàn)場(chǎng)必須佩戴安全帽,嚴(yán)禁酒后上班。
2.工人在工地不準(zhǔn)打罵,如有打架斗毆者甲方有權(quán)采取罰款及驅(qū)除廠外。
3.乙方施工應(yīng)嚴(yán)格遵守安全操作規(guī)程及安全技術(shù)措施,正確使用安全保護(hù)用品,切實(shí)做到安全生產(chǎn)、文明施工。
4.未經(jīng)甲方同意及有關(guān)部門(mén)批準(zhǔn),施工中不得隨意拆改原建筑物結(jié)構(gòu)及各種設(shè)備管線。
5.工程竣工未移交甲方之前,負(fù)責(zé)對(duì)現(xiàn)場(chǎng)的一切設(shè)施和工程成品進(jìn)行保護(hù)。
第五條 關(guān)于工程價(jià)款、承包內(nèi)容、結(jié)算的約定:
1. 工程款付款方式:布管驗(yàn)收合格后支付工錢(qián)的50%,水電完工后支付30%,整體竣工驗(yàn)收合格后支付20%
2. 乙方承包內(nèi)容:
1).水電開(kāi)槽、布線、穿線、埋槽
2).所有水電施工過(guò)程的垃圾清運(yùn)(每天現(xiàn)場(chǎng)整理裝袋)
3).水電施工的穿墻、打孔、切割
4).開(kāi)關(guān)面板安裝
5).小五金、馬桶、的安裝
6).后期燈具的安裝
3.工程結(jié)算方式: 按實(shí)結(jié)算: 總價(jià)結(jié)算:13元/平米(套內(nèi)面積)
第六條 糾紛處理方式: 因工程質(zhì)量雙方發(fā)生爭(zhēng)議時(shí),雙方協(xié)商解決;當(dāng)事人不愿通過(guò)協(xié)商、調(diào)解解決,或協(xié)商、調(diào)解不成時(shí),可以按照本合同約定向向人民法院提起訴訟。
第六條 附則
1.本合同經(jīng)甲、乙雙方簽字(蓋章)后生效。
2.本合同簽訂后工程不得轉(zhuǎn)包。
3.本合同一式兩份,甲、乙雙方各執(zhí)一份
甲方(公章):_________乙方(公章):_________
法定代表人(簽字):_________ 法定代表人(簽字):_________
_________年____月____日 _________年____月____日
家庭水電安裝合同書(shū)范文2甲方:(發(fā)包方):
乙方:(承包方)
本著互相信任的原則,就甲方的水電工程達(dá)成以下協(xié)議。
第一條 工程概況
1.裝修施工地點(diǎn):墨山小區(qū)世紀(jì)之窗A9-3棟
2.工期:_________年_______月_______日 至________年_______月_______日
3.本項(xiàng)工程預(yù)計(jì)費(fèi)用2300元人民幣。
第二條 材料供應(yīng)的約定
1.甲方提供的材料
乙方必須至少提前三天向甲方提出下一工序需要購(gòu)買(mǎi)的材料的清單,并注明所需要材料的數(shù)量。甲方應(yīng)按時(shí)提供乙方需要的材料。甲方負(fù)責(zé)采購(gòu)供應(yīng)的材料應(yīng)符合設(shè)計(jì)要求的合格產(chǎn)品,并應(yīng)按時(shí)供應(yīng)到現(xiàn)場(chǎng),甲乙方應(yīng)辦理交接手續(xù)。乙方如發(fā)現(xiàn)甲方提供的材料有質(zhì)量問(wèn)題或規(guī)格差異,應(yīng)及時(shí)向甲方提出,甲方仍表示使用的,由此造成工程損失,責(zé)任由甲方承擔(dān)。甲方供應(yīng)的材料按時(shí)抵達(dá)現(xiàn)場(chǎng)后,由乙方負(fù)責(zé)保管,由于保管不當(dāng)造成的損失,由乙方負(fù)責(zé)賠償。
2.甲方采購(gòu)供應(yīng)的裝飾材料,均應(yīng)用于本合同規(guī)定的住宅裝飾,非經(jīng)甲方同意,乙方不得挪作他用。如乙方違反此規(guī)定,應(yīng)按挪用材料價(jià)款的十倍補(bǔ)償給甲方。
3.甲方提供的材料
甲方供應(yīng)的水電材料乙方應(yīng)到現(xiàn)場(chǎng)驗(yàn)收,如不符合設(shè)計(jì)、施工要求或規(guī)格有差異,應(yīng)禁止使用。如已使用,對(duì)工程造成的損失由乙方負(fù)責(zé)。乙方自帶施工的必須工具(錐子、切割片等),要保證安全性、良好使用性,乙方自行承擔(dān)工具維修費(fèi)和損耗費(fèi)用。
第三條 關(guān)于工程質(zhì)量及驗(yàn)收的約定
1.本工程應(yīng)嚴(yán)格執(zhí)行國(guó)家《住宅裝飾裝修工程施工規(guī)范》GB50210-20xx及《建筑裝飾裝修工程質(zhì)量驗(yàn)收規(guī)范》GB50327-20xx并參照《福建省家庭裝飾裝修工程質(zhì)量標(biāo)準(zhǔn)及其他 DB-35/T98》及《上海市家庭裝飾工程質(zhì)量驗(yàn)收標(biāo)準(zhǔn)》。
2.由于乙方施工技術(shù)差及責(zé)任心不到位等自身原因造成質(zhì)量問(wèn)題,其返工費(fèi)用由乙方承擔(dān),工期不變。
3.工程竣工:乙方應(yīng)提前兩天通知甲方驗(yàn)收,甲方在接到通知兩日內(nèi)組織驗(yàn)收,并辦理驗(yàn)收手續(xù)。
第四條 有關(guān)安全生產(chǎn)和防火等的現(xiàn)場(chǎng)管理約定:
1.嚴(yán)格遵守規(guī)定的裝飾裝修施工時(shí)間,降低施工噪音,減少環(huán)境污染。處理好由于施 工帶來(lái)的擾民問(wèn)題及與周?chē)鷨挝?、住戶的關(guān)系。
2.未經(jīng)甲方同意及有關(guān)部門(mén)批準(zhǔn),施工中不得隨意拆改原建筑物結(jié)構(gòu)及各種設(shè)備管線。
3.工程竣工未移交甲方之前,負(fù)責(zé)對(duì)現(xiàn)場(chǎng)的一切設(shè)施和工程成品進(jìn)行保護(hù)。
4.保證裝飾裝修現(xiàn)場(chǎng)的整潔,竣工前做好衛(wèi)生清掃和處理工作。
5.負(fù)責(zé)裝飾裝修所產(chǎn)生垃圾的處理工作,每日至少清潔一次。
6.乙方如因施工原因需居住在現(xiàn)場(chǎng),日常用水、用電等必須注意安全,工地發(fā)生工傷由乙方負(fù)責(zé)。
7.乙方應(yīng)做好施工材料保管工作,禁止閑雜人等進(jìn)入現(xiàn)場(chǎng)。
8.未經(jīng)甲方許可,乙方不得攜帶任何甲供的裝修材料出門(mén),若發(fā)現(xiàn)偷盜現(xiàn)象按材料價(jià)格十倍賠償。
第五條 關(guān)于工程價(jià)款、承包內(nèi)容、施工工藝、結(jié)算的約定:
1. 工程款付款方式:
進(jìn)場(chǎng)動(dòng)工前期支付工錢(qián)的20%,布管驗(yàn)收合格后支付30%,水電完工后支付30%,整體竣工驗(yàn)收合格后支付20%。
2. 乙方承包內(nèi)容:
(1).水電開(kāi)槽、布線、穿線、埋槽
(2).乙方在水電施工過(guò)程中產(chǎn)生的垃圾應(yīng)由乙方當(dāng)天清理(每天現(xiàn)場(chǎng)整理裝袋)
(3).水電施工的穿墻、打孔、切割
(4).開(kāi)關(guān)面板安裝
(5).小五金、衛(wèi)生潔具的安裝
(6).后期燈具的安裝
3.工程結(jié)算方式:
按實(shí)結(jié)算:
總價(jià)結(jié)算:總價(jià)2300元(整棟房屋所有水電)
第六條 違約責(zé)任:
1.甲方未按合同約定時(shí)間付款的,每逾期一天,甲方向乙方支付伍拾元的違約金。
2.由于乙方原因逾期竣工的,每逾期一天,乙方向甲方支付伍拾元違約金。
第七條 糾紛處理方式:
因工程質(zhì)量雙方發(fā)生爭(zhēng)議時(shí),雙方協(xié)商解決;當(dāng)事人不愿通過(guò)協(xié)商、調(diào)解解決,或協(xié)商、調(diào)解不成時(shí),可以按照本合同約定向向人民法院提起訴訟。
第八條 合同的變更和解除:
1.合同經(jīng)雙方簽字生效后,雙方必須嚴(yán)格遵守。任何一方需變更合同內(nèi)容,應(yīng)經(jīng)協(xié)商一致后,重新簽訂補(bǔ)充協(xié)議。合同簽訂后施工前,一方如要終止合同,應(yīng)以書(shū)面形式提出,并按合同總價(jià)款 10 %支付違約金,并辦理終止合同手續(xù)。
2.施工過(guò)程中任何一方提出終止合同,須向另一方以書(shū)面形式提出,經(jīng)雙方同意辦理清算手續(xù),訂立終止合同協(xié)議,解除本合同。
第九條.其它約定:
1.因氣候、停電等不可抗力或不可預(yù)見(jiàn)因素造成的工期延誤,經(jīng)雙方確認(rèn)后可以順延。
2.保修期內(nèi)由于乙方的施工和產(chǎn)品造成的質(zhì)量問(wèn)題由乙方免費(fèi)維修,在接到甲方通知后48小時(shí)內(nèi)必須到達(dá)現(xiàn)場(chǎng)。由于甲方使用不當(dāng)或不可抗力或不可遇見(jiàn)原因造成的問(wèn)題,甲方按實(shí)際發(fā)生費(fèi)用支付乙方維修費(fèi)用。
第十條 附則
(一) 本合同經(jīng)甲、乙雙方簽字(蓋章)后生效。
(二)本合同簽訂后工程不得轉(zhuǎn)包。
(三)本合同一式兩份,甲、乙雙方各執(zhí)一份。 (四)合同有效期至所有水電工程竣工為止。
(五) 水電工程保修伍年,過(guò)了保修期乙方來(lái)維護(hù)甲方應(yīng)支付相應(yīng)費(fèi)用。
甲方(公章):_________乙方(公章):_________
法定代表人(簽字):_________ 法定代表人(簽字):_________
_________年____月____日 _________年____月____日
家庭水電安裝合同書(shū)范文3甲方:
乙方:
甲乙雙方在平等、自愿、協(xié)商一致的基礎(chǔ)上,本著相互信任的原則,就甲方的水電工程安裝達(dá)成如下協(xié)議:
第一條:工程概況
1、工程地點(diǎn):姚家組 三層別墅
2、工程承包方式:包工不包料
第二條:乙方承包內(nèi)容
1、水電開(kāi)槽、布線、穿線、埋槽、防雷安裝
2、水電施工的穿墻打孔、切割
3、開(kāi)關(guān)面板安裝
4、小五金、馬桶的安裝
5、后期燈具的安裝、屋外圍墻電(客廳大吊燈另行結(jié)算)
第三條:工程結(jié)算方式
按圖紙面積結(jié)算,總價(jià)結(jié)算38元/平方米,圖紙面積712平方米。
第四條:安全
乙方在施工時(shí)必須文明施工,在施工過(guò)程中乙方必須做到用好梯子,結(jié)構(gòu)牢固,上班必須戴安全帽。若在施工過(guò)程中出現(xiàn)安全事故,一切責(zé)任概由乙方承擔(dān),甲方不負(fù)任何連帶責(zé)任。施工中,乙方必須按圖紙跟進(jìn)房屋的施工進(jìn)度埋管。本合同一式二份,甲乙雙方各執(zhí)一份。
甲方(公章):_________乙方(公章):_________
篇4
收稿日期:20160527
基金項(xiàng)目:陜西省科學(xué)技術(shù)研究發(fā)展計(jì)劃項(xiàng)目(2013K0905)
摘要:水流沖刷常導(dǎo)致橋梁樁基耐久性、承載力降低,使結(jié)構(gòu)安全性不足。文章依托某公路大橋主橋樁基加固工程,通過(guò)總結(jié)分析頂推鋼套筒主動(dòng)加固樁基法的技術(shù)方案、加固構(gòu)造、施工工藝、施工監(jiān)控以及應(yīng)用效果,發(fā)現(xiàn)該項(xiàng)技術(shù)能有效降低黃河水流沖刷的危害,且對(duì)土層樁側(cè)摩阻力較小的橋梁群樁基礎(chǔ)加固具有良好的適用性,可為類(lèi)似樁基加固工程提供參考和借鑒。
關(guān)鍵詞:沖刷;樁基加固;鋼套筒;頂推施工
中圖分類(lèi)號(hào):U445.4文獻(xiàn)標(biāo)志碼:B
Pile Foundation Reinforcement of Bridge Across Yellow River with
Steel Sleeve Jacking and Control Technology
YU Licun, YAO Xiaofei, ZHOU Jiang
(CCCC First Highway Consultants Co., Ltd., Xian 710075, Shaanxi, China)
Abstract: Given that water scouring often leads to the reduction of durability and bearing capacity of bridge pile and compromises structural safety, the pile foundation reinforcement project of a bridge across the Yellow River was taken to study the technical solutions, reinforcement structure, construction technology, monitoring of the construction process and application effect of steel sleeve jacking, an active reinforcement method for pile foundation. It is found out that this method effectively reduces the damage to the bridge by the current of Yellow River, and is suitable for pile cluster with less friction resistance from soil.
Key words: scour; pile foundation reinforcement; steel sleeve; jacking
0引言
黃河水流夾沙量高,汛期水流速大,水流沖刷已成為跨黃河橋梁失效的主要原因之一。沖刷使橋梁樁周土層不斷減少,樁基外露樁長(zhǎng)增加,樁身混凝土及鋼筋受到侵蝕,橋梁承載力降低,結(jié)構(gòu)安全性受到威脅。對(duì)損傷橋梁樁基及時(shí)進(jìn)行修復(fù)并采取相應(yīng)的預(yù)防性措施,是消除結(jié)構(gòu)安全隱患的重要保障[12]。
目前針對(duì)橋梁沖刷病害的加固措施主要有圍堰套箍法、普通鋼套筒和水下玻纖套筒加固3種。圍堰套箍法是使用鋼板樁圍堰進(jìn)行臨時(shí)圍護(hù),以常規(guī)的增加截面法加固橋墩[34]。普通鋼套筒加固是指對(duì)樁身進(jìn)行清理后,在樁身外安裝鋼套筒,鋼套筒不頂入土層,或嵌入土層05~1 m后,將鋼套筒中的水抽干澆筑填充混凝土的一種樁基加固方法[56]。水下玻纖套筒加固又稱“夾克法”,是利用玻纖套筒加固系統(tǒng)與樁基粘結(jié)成一個(gè)整體并阻止鋼筋進(jìn)一步銹蝕,修復(fù)并永久保護(hù)混凝土表面的一種樁基加固技術(shù)[7]。這3種措施的共同缺點(diǎn)是嵌入土層深度小,在黃河水的不斷沖刷下,無(wú)法起到長(zhǎng)期防沖刷的作用;此外,圍堰套箍法加固施工措施費(fèi)用高,水下玻纖套筒加固對(duì)含高沙量的黃河水的磨損適應(yīng)性差[8]。
本文針對(duì)某黃河公路大橋的結(jié)構(gòu)類(lèi)型、病害情況、地質(zhì)條件提出深度頂推鋼套筒主動(dòng)加固橋梁樁基的方案,并對(duì)其加固構(gòu)造、施工工藝、施工監(jiān)控以及應(yīng)用進(jìn)行詳細(xì)介紹,以期為日后類(lèi)似工程為鑒。
1工程概況
某黃河公路大橋主橋?yàn)?跨100 m鋼管混凝土系桿拱橋,主橋下部結(jié)構(gòu)為空心墩,群樁基礎(chǔ),每個(gè)橋墩由2個(gè)邊墩和1個(gè)中墩組成,邊墩4根樁基,中墩8根樁基,樁基直徑均為2 m,設(shè)計(jì)樁長(zhǎng)為72~78 m。橋梁立面如圖1所示。
圖1某黃河公路大橋主橋立面
經(jīng)檢測(cè),主橋橋墩樁基河床嚴(yán)重下切,樁基沖刷深度為4.0~9.3 m,部分沖刷深度大于鋼護(hù)筒長(zhǎng)度,致使樁內(nèi)芯外露,侵蝕嚴(yán)重,樁基普遍出現(xiàn)縮頸、扭曲擴(kuò)徑、鋼筋外露銹蝕等病害。這些病害造成樁基耐久性和承載能力降低,結(jié)構(gòu)安全存在一定的隱患,適用性上存在不可接受的缺陷。
2樁基加固方案
2.1加固方案
黃河河道變遷頻繁,樁基沖刷深度大,普通鋼套筒加固僅能外包沖刷地面線以上部分,無(wú)法達(dá)到長(zhǎng)期防護(hù)的作用。根據(jù)沖刷深度監(jiān)測(cè),本橋均為外露高樁承臺(tái),沖刷地面線以上外露樁基長(zhǎng)度為3.1~9.6 m,且樁基土層主要以側(cè)摩阻力較小的松散粉砂和細(xì)砂為主,為鋼套筒深度頂推切入土層提供了便利條件。因此,在普通鋼套筒加固的基礎(chǔ)上,采用深度頂推鋼套筒主動(dòng)加固樁基法,可以達(dá)到預(yù)防沖刷,提高樁基承載力、耐久性,增強(qiáng)主橋樁基可靠性,延長(zhǎng)其使用壽命的目的。
深度頂推鋼套筒加固法是利用群樁承臺(tái),使用千斤頂反頂鋼套筒嵌入土層至沖止高程,以鋼套筒作為施工模板和永久防護(hù)構(gòu)造的方式進(jìn)行樁基外包加固[9]。預(yù)制截面尺寸比原樁略大的鋼套筒,分節(jié)段安裝、頂推鋼套筒,并配合高壓射水及泵吸清除鋼套筒與樁身之間的土層,灌注水泥砂漿,使鋼套筒和原樁連接為一體,達(dá)到樁基沖刷防護(hù)和加固補(bǔ)強(qiáng)的效果。
2.2鋼套筒加固構(gòu)造
為使鋼套筒起到長(zhǎng)期防護(hù)的作用,將鋼護(hù)筒嵌入至沖止高程,各樁基鋼套筒設(shè)計(jì)長(zhǎng)度為16 m。每根鋼護(hù)筒共劃分為14個(gè)節(jié)段,1個(gè)首節(jié)段、11個(gè)標(biāo)準(zhǔn)節(jié)段和1個(gè)末節(jié)段。首節(jié)段長(zhǎng)為24 m,標(biāo)準(zhǔn)節(jié)段長(zhǎng)為12 m,末節(jié)段長(zhǎng)為04 m(圖2(a))。樁基實(shí)際檢測(cè)直徑為21~23 m,鋼套筒外徑為25 m。每個(gè)節(jié)段由2個(gè)半圓柱組成,并均勻設(shè)置4道縱向加勁肋,首節(jié)段設(shè)置45°刃角(圖2(b))。鋼套筒壁厚為20 mm,縱向加勁肋厚為16 mm。鋼套筒和其他鋼構(gòu)件均采用Q345C鋼板。各構(gòu)件間采用焊接形成整體。首節(jié)段和標(biāo)準(zhǔn)節(jié)段內(nèi)直接泵送灌注M30微膨脹水泥砂漿,末節(jié)段采用壓力注漿灌注水泥漿。
圖2鋼套筒頂推構(gòu)造
3鋼套筒頂推加固施工工藝
樁基鋼套筒頂推加固的主要施工工藝流程為:施工平臺(tái)搭設(shè)、樁身處理、鋼套筒制作和安裝、鋼套筒頂推、填充水泥砂漿。
3.1施工平臺(tái)搭設(shè)
采用設(shè)置在承臺(tái)薄壁墩周?chē)谋鈸?dān)鋼梁,通過(guò)手拉葫蘆和鋼絲繩分別吊起的施工平臺(tái)及臨時(shí)吊籃的移動(dòng)軌道梁。整個(gè)結(jié)構(gòu)由上至下分別為:承臺(tái)面上I25b工字鋼扁擔(dān)梁、承臺(tái)底下I25b工字鋼施工鋼平臺(tái)、通過(guò)手拉葫蘆連接的施工鋼平臺(tái)。施工鋼平臺(tái)四周及承臺(tái)底面以下平臺(tái)周?chē)信R水面均用Φ50×2.5 mm焊接鋼管設(shè)置護(hù)欄。
3.2樁身處理
對(duì)樁基原施工鋼護(hù)筒進(jìn)行切割,鑿除樁身劣化及多余混凝土,銹蝕鋼筋除銹。
(1)樁基原施工鋼護(hù)筒切割。樁基原施工鋼護(hù)筒采用氣切割,對(duì)鋼護(hù)筒沿縱向和環(huán)向進(jìn)行分塊切割,切割后從樁基混凝土剝離鑿除。
(2)樁身劣化及多余混凝土鑿除。對(duì)于厚度大于10 cm的多余擴(kuò)徑混凝土采用氣泵風(fēng)鎬機(jī)械鑿除,在鑿除前應(yīng)先進(jìn)行外露實(shí)際樁徑測(cè)量及主筋保護(hù)層厚度探測(cè),鑿除后的鋼筋保護(hù)層厚度不小于原設(shè)計(jì)厚度,并進(jìn)行定位放線,標(biāo)識(shí)出應(yīng)鑿除混凝土的外邊線;對(duì)于混凝土蜂窩麻面、松散、破碎、剝落和鋼筋銹脹外露區(qū)域以及厚度小于10 cm的多余混凝土,采用人工鑿除,使表面粗糙凹凸差不小于6 mm,并將樁基最大直徑控制在2.1 m以內(nèi)。
(3)鋼筋除銹。外露銹蝕鋼筋先用鋼刷對(duì)其表面的銹蝕氧化層進(jìn)行處理,然后涂刷或用高壓噴槍噴涂多功能阻銹劑。
3.3鋼套筒制作與安裝
(1)鋼套筒的制作。鋼套筒鋼管采用厚度為20 mm的鋼板卷制成2個(gè)半圓管。卷管時(shí),鋼管受力方向應(yīng)與鋼板壓延方向一致,管體成形必須校圓,失圓度不得大于2 mm。在加工過(guò)程中,焊接縱向加勁肋、內(nèi)襯鋼板,鋼管各片構(gòu)件應(yīng)在岸上預(yù)先進(jìn)行試拼裝及防腐處理,并在鋼套筒外表面焊接臨時(shí)吊環(huán),吊環(huán)應(yīng)豎向放置焊接。
(2)鋼套筒的安裝。
鋼套筒先采用2片半圓構(gòu)件拼接形成1個(gè)節(jié)段,各節(jié)段再進(jìn)行由下至上豎直拼裝。安裝時(shí)應(yīng)以事先確定好的原樁基軸線為準(zhǔn),各段筒體縱焊縫十字錯(cuò)開(kāi)。在鋼套筒控制點(diǎn)的高程和軸線均滿足設(shè)計(jì)要求后,固定各片構(gòu)件的位置,然后施焊接頭。
3.4鋼套筒頂推
(1)將沖刷地面線以上部分鋼套筒安裝到位,并預(yù)留承臺(tái)與鋼套筒間千斤頂?shù)陌惭b空間。
(2)在鋼套筒定位準(zhǔn)確后,安裝支撐上、下墊板及液壓千斤頂同步頂推設(shè)備。在鋼套筒四周布設(shè)4個(gè)千斤頂,千斤頂?shù)妮S線和鋼套筒外壁與縱向加勁肋交線保持在一條直線上。千斤頂?shù)牧砍炭刂圃谧畲箜斖屏Φ?.25~1.5倍。
(3)千斤頂采用同步頂推,頂推力與位移雙控。在頂推過(guò)程中使鋼套筒頂面保持水平,頂面最大高差不大于5 mm。
(4)在鋼套筒內(nèi)壁預(yù)先安裝BW150型射水泵,邊沖刷筒內(nèi)壁土層邊頂推,同時(shí)采用自吸無(wú)堵塞排污泵清理泥漿。在千斤頂滿量程前應(yīng)使用頂推連接柱接長(zhǎng),頂推連接柱的軸線應(yīng)與千斤頂?shù)妮S線一致。
(5)當(dāng)頂推長(zhǎng)度大于鋼套筒節(jié)段時(shí),安裝下一個(gè)鋼套筒標(biāo)準(zhǔn)節(jié)段,此流程循環(huán)進(jìn)行,直到鋼套筒頂推至設(shè)計(jì)標(biāo)高。
3.5水泥砂漿泵送和灌注
當(dāng)最后一個(gè)鋼套筒標(biāo)準(zhǔn)節(jié)段安裝完成后,清理套筒內(nèi)壁泥漿時(shí),預(yù)留50 cm土層不進(jìn)行清理,作為封底層。采用砂漿攪拌機(jī)攪拌,通過(guò)架設(shè)水平管道運(yùn)輸泵送M30微膨脹水泥砂漿填充鋼套筒首節(jié)段和標(biāo)準(zhǔn)節(jié)段。水泥砂漿必須連續(xù)一次性澆注完,并在鋼套筒內(nèi)的樁兩側(cè)同時(shí)灌注。灌注時(shí)灌注管沿樁周來(lái)回緩慢移動(dòng),砂漿從管下端灌進(jìn);嚴(yán)格控制泵送量,同時(shí)用振動(dòng)棒攪動(dòng),使鋼套筒內(nèi)水泥砂漿填充均勻密實(shí)。
3.6安裝封頂節(jié)段鋼套筒和壓力注漿
鋼套筒末節(jié)段采用壓力注漿,使末節(jié)段頂面與承臺(tái)底頂緊,并在底端設(shè)置注漿孔,頂端設(shè)置排氣孔。末節(jié)段頂面與承臺(tái)頂間采用密封膠進(jìn)行密封硬化后,進(jìn)行壓氣試驗(yàn),以檢查封閉帶是否封嚴(yán)。從注漿孔注入水泥灌漿料,直到頂端所有排氣孔均溢出水泥漿為止;待鋼套筒內(nèi)水泥砂漿初凝后,對(duì)注漿孔和排氣孔及時(shí)填塞,并在表面進(jìn)行焊接密封。
4鋼套筒頂推控制
4.1鋼套筒頂推監(jiān)控內(nèi)容及要求
鋼套筒頂推以頂入深度為控制目標(biāo),以最大頂推力作為主要終止條件,以鋼套筒偏位、同樁基各千斤頂頂推力差異、承臺(tái)及其他構(gòu)件出現(xiàn)異常損傷為輔助終止條件。鋼套筒頂推具體監(jiān)控內(nèi)容及控制要求有以下幾點(diǎn)。
(1)鋼套筒頂推力。記錄實(shí)際各樁基不同節(jié)段鋼套筒的總頂推力;實(shí)際總頂推力不大于理論計(jì)算最大頂推力,同一樁基各千斤頂?shù)挠捅碜x數(shù)相差不大于10%。
(2)鋼套筒偏位。在施工全過(guò)程中對(duì)每個(gè)鋼套筒頂均勻設(shè)置4個(gè)高程觀測(cè)點(diǎn),并測(cè)量每個(gè)鋼套筒節(jié)段的垂直度;同一節(jié)段鋼套筒頂各點(diǎn)高程差不大于5 mm,垂直度不大于05%。
(3)結(jié)構(gòu)異常損傷。在鋼套筒頂推過(guò)程中,派專(zhuān)人觀測(cè)承臺(tái)裂縫的變化情況、承臺(tái)與樁基的結(jié)構(gòu)狀況以及其他結(jié)構(gòu)異常響應(yīng),避免產(chǎn)生新的結(jié)構(gòu)病害。
4.2鋼套筒頂推控制結(jié)果
本工程選擇在黃河枯水期進(jìn)行施工,施工周期共60 d,頂推鋼套筒加固208#~210#橋墩共48根樁基;其中43根樁基鋼套筒均頂推至設(shè)計(jì)高程,且實(shí)際總頂推力小于理論計(jì)算最大頂推力值,鋼套筒偏位和結(jié)構(gòu)損傷監(jiān)控均滿足要求。另5根未頂推到位樁基鋼套筒參數(shù)見(jiàn)表1。
由表1可見(jiàn),5根樁基鋼套筒的實(shí)際頂入長(zhǎng)度為設(shè)計(jì)鋼套筒長(zhǎng)度的055~060倍,實(shí)際總頂推力均已達(dá)到理論計(jì)算最大頂推力,且實(shí)測(cè)的鋼套筒垂直度和高程差均已超限。采用單側(cè)加大頂推力、加大射水、抽沙力度等多種措施后,依然無(wú)法頂進(jìn)。
通過(guò)快速圍堰開(kāi)挖209#34樁周?chē)巴?,同時(shí)切割40 mm×40 mm 小窗口,用長(zhǎng)鋼筋插搗樁周,發(fā)現(xiàn)河床面以下部分樁基局部擴(kuò)徑,鋼套筒縱向加勁肋緊貼樁基擴(kuò)徑部位,并擠出一條縱槽。由于擴(kuò)徑處空間狹小,砂土已被嚴(yán)重?cái)D密,導(dǎo)致鋼套筒無(wú)法繼續(xù)向深部頂進(jìn)。分析認(rèn)為此類(lèi)樁基存在局部擴(kuò)徑,導(dǎo)致鋼套筒單側(cè)被卡傾斜,無(wú)法繼續(xù)頂進(jìn);鋼套筒傾斜產(chǎn)生的水平力將對(duì)原樁基產(chǎn)生不利影響,在此條件下終止頂推。
5結(jié)語(yǔ)
深度頂推鋼套筒主動(dòng)加固樁基法無(wú)需修建水中圍堰和搭設(shè)反力架,施工難度較小,安全性高,速度快,工程造價(jià)低,且沖刷防護(hù)深度大,可有效提高受侵蝕樁基的承載力和耐久性,是橋梁水下或陸上高樁承臺(tái)樁基一種極為有效的加固方案,尤其適用位于粉土、粉砂、細(xì)砂等側(cè)摩阻力較小的土層樁基加固。本文針對(duì)某黃河公路大橋樁基的土層資料、結(jié)構(gòu)類(lèi)型和病害狀況,將鋼護(hù)筒頂推工藝應(yīng)用于樁基加固中,其鋼護(hù)筒最大頂入土中深度達(dá)13 m,目前尚屬國(guó)內(nèi)類(lèi)似加固工程中的首例。工程實(shí)踐表明,深度頂推鋼套筒主動(dòng)加固樁基法可操作性強(qiáng),加固效果顯著,能夠有效地解決樁基沖刷和強(qiáng)度削弱問(wèn)題,可為類(lèi)似樁基加固工程提供借鑒。
參考文獻(xiàn):
[1]王成華,高洋,李全輝.沖刷條件下既有橋梁樁基礎(chǔ)工作性狀研究進(jìn)展[J].鐵道標(biāo)準(zhǔn)設(shè)計(jì),2016(1):5965.
[2]王全,劉洪瑞,吳冬亮.河床下切對(duì)橋梁樁基承載能力的影響及加固[J].城市道橋與防洪,2010(1):6063.
[3]練廣龍,吳泳鈿.橋梁水中樁樁基加固應(yīng)用研究[J].低溫建筑技術(shù),2014,36(5):133134.
[4]楊勇.基于組合式鋼套筒法的大跨徑拱橋樁基加固實(shí)踐[J].廣東建材,2015(6):5053.
[5]譚曉琦,周春生,蘇加強(qiáng).云南德宏盈江大橋、平原大橋樁基加固設(shè)計(jì)[J].公路交通科技:應(yīng)用技術(shù)版,2015(6):8384.
[6]于鵬,蔣昌平.“夾克法”加固橋梁樁基礎(chǔ)的應(yīng)用研究[C]∥2014年全國(guó)公路養(yǎng)護(hù)技術(shù)學(xué)術(shù)年會(huì)論文集橋隧卷.2014.
[7]王善波,張晨陽(yáng).水上橋梁鋼管樁施工技術(shù)[J].浙江建筑,2011,28(10):4345.
篇5
關(guān)鍵詞:頸叢神經(jīng);嗎啡;PCIA;甲狀腺切除術(shù)
中圖分類(lèi)號(hào):R614.2+7;R653 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1008-2409(2007)04-0684-02
腔鏡甲狀腺切除術(shù)是最近幾年發(fā)展的一種新的手術(shù)方法,乳暈入路腔鏡甲狀腺切除術(shù)是目前最理想的方法,手術(shù)切口小而隱蔽,并遠(yuǎn)離頸部,達(dá)到美觀、微創(chuàng)的手術(shù)效果。但由于該路徑長(zhǎng),給術(shù)后鎮(zhèn)痛帶來(lái)一定的難度。筆者從2004年1月以來(lái)采用頸叢嗎啡聯(lián)合芬太尼PCIA用于腔鏡甲狀腺切除術(shù)后鎮(zhèn)痛14例,收到良好的效果。本研究旨在選擇最佳的鎮(zhèn)痛方法。
1 資料與方法
1.1 一般資料
選擇ASA I~Ⅱ級(jí).既往無(wú)心、肺、肝、腎及血液系統(tǒng)等主要臟器功能疾患,擇期行甲狀腺手術(shù)患者28例,均為女性,年齡(37.86±4.28)歲。將患者分為兩組,其中實(shí)驗(yàn)組14例,采用頸叢嗎啡聯(lián)合芬太尼PCIA;對(duì)照組14例,采用芬太尼PCIA。
1.2方法
28例患者入手術(shù)室前30min肌肉注射魯米那100mg。阿托品0.5mg。實(shí)驗(yàn)組于靜脈開(kāi)放后,以0.75%布比卡因5ml+2%利多卡因10ml+嗎啡2mg行雙側(cè)頸淺叢穿刺注射,繼以力月西0.1mg/kg+芬太尼4μg/kg+丙泊酚1~2mg/kg+阿曲庫(kù)銨0.8mg/kg靜脈注射為誘導(dǎo),給氧去氮后插入氣管導(dǎo)管,接呼吸機(jī)控制呼吸,即行手術(shù)。術(shù)中以瑞芬太尼和丙泊酚微泵靜脈注射及阿曲庫(kù)銨靜脈分次維持麻醉。術(shù)畢給予芬太尼1.0mg+力月西10mg加生理鹽水至100ml行PCIA。而對(duì)照組則不行頸淺叢注射,開(kāi)放靜脈后即行全麻誘導(dǎo)插管,誘導(dǎo)方法及術(shù)中維持與實(shí)驗(yàn)組相同,術(shù)畢給予芬太尼1.0mg+力月西10mg加生理鹽水至100ml行PCIA。兩組的PCIA持續(xù)背景劑量2ml/h,PCA0.5ml,鎖定時(shí)間為15min。對(duì)術(shù)后鎮(zhèn)痛效果不佳者給予哌替啶肌肉注射。
1.3 觀察與監(jiān)測(cè)項(xiàng)目
根據(jù)世界衛(wèi)生組織(WHO)標(biāo)準(zhǔn)和術(shù)后患者的臨床表現(xiàn),將術(shù)后疼痛程度分為如下4級(jí):O級(jí):切口無(wú)痛。I級(jí)(輕):輕度可忍受的疼痛。I級(jí)(中):中度持續(xù)的疼痛。I級(jí)(重):強(qiáng)烈持續(xù)的劇烈疼痛,需用鎮(zhèn)痛藥治療。記錄術(shù)后患者惡心、嘔吐、皮膚瘙癢、尿潴留和呼吸抑制等并發(fā)癥發(fā)生率。記錄PCIA的用量,哌替啶的使用情況。
1.4 統(tǒng)計(jì)學(xué)分析
所得結(jié)果計(jì)量資料以均數(shù)土標(biāo)準(zhǔn)差(x+s)表示,P
2 結(jié)果
2.1 一般情況比較
兩組患者在ASA分級(jí)、年齡、體重、性別和手術(shù)時(shí)間等方面無(wú)顯著差異,P>0.05。
2.2 鎮(zhèn)痛效果
實(shí)驗(yàn)組中有1例鎮(zhèn)痛效果差,術(shù)后需用哌替啶肌肉注射,其余13例鎮(zhèn)痛效果良好;而對(duì)照組中有5例鎮(zhèn)痛效果差,需用哌替啶肌肉注射(見(jiàn)表1)。
2.3 不良反應(yīng)
兩組患者均未出現(xiàn)呼吸抑制,惡心、嘔吐、皮膚瘙癢、尿潴留情況基本相同,P>0.05。
3 討論
腔鏡下胸骨前徑路行甲狀腺切除是目前最理想的手術(shù)方式,于胸骨前平雙連線作12mm切口,置入氣囊分離套管,沿胸大肌筋膜淺層鈍性分離至甲狀腺,插入10mm trocar,皮膚縫合1針并固定trocar。灌注CO2氣體,壓力6~8mmHg,置入腹腔鏡。于腫瘤側(cè)乳暈作5mm切口,對(duì)側(cè)同一位置作12mm切口,腹腔鏡直視下穿刺2個(gè)5mm、10mm trocar,插入相應(yīng)腹腔鏡器械,繼續(xù)游離皮瓣,建立手術(shù)空間。其特點(diǎn)是觀察孔和操作孔與病灶位置較遠(yuǎn),切口不在頸部,美容效果佳,但游離的皮瓣范圍較廣,創(chuàng)傷大。
甲狀腺手術(shù)后患者因?yàn)樘弁从型萄收系K、咳嗽,另外頭部位置不當(dāng)也可使疼痛明顯和加劇,再加上特殊的術(shù)后半坐,影響患者休息。嗎啡的局部鎮(zhèn)痛作用具有特異性,和中樞一樣,外周阿片受體主要有μ、δ和k受體,三者均可特異性介導(dǎo)外周的鎮(zhèn)痛作用,其中以μ受體作用最突出,δ受體次之。目前已從形態(tài)和功能上證實(shí)了從免疫細(xì)胞來(lái)的阿片肽和位于外周感覺(jué)神經(jīng)上的受體相結(jié)合產(chǎn)生鎮(zhèn)痛作用,阿片受體激動(dòng)劑占領(lǐng)受體后,可能通過(guò)以下2種途徑產(chǎn)生鎮(zhèn)痛作用:①降低感受疼痛的傳入神經(jīng)末梢的興奮性,抑制動(dòng)作電位的傳播。②從中樞或初級(jí)傳入神經(jīng)纖維末梢來(lái)的P物質(zhì)釋放被抑制。因此淺頸叢區(qū)域內(nèi)鎮(zhèn)痛效果明顯。但是由于游離的皮瓣范圍較廣,而淺頸叢嗎啡不能達(dá)到雙連線,相當(dāng)于T4的平面,因此胸骨前壁鎮(zhèn)痛效果差。
篇6
關(guān)鍵詞:LigaSure血管閉合系統(tǒng);超聲刀;甲狀腺癌根治術(shù);并發(fā)癥
Abstract:Objective The aim of the study was to compare operative factors, postoperative outcomes, and surgical complications of thyroidectomy using Ligasure vessel sealing system versus the harmonic focus scalpel.Methods The study was a single-blind, randomized controlled trial. It was conducted from January 2015 to December 2015 in the Central Hospital of Wuhan. 400 patients who were clinical diagnosed thyroid cancer registered to this study. They were randomly assigned into two groups: LigaSure(L), Harmonic scalpel(H).Operative time drainage volume (day 1 after operation), haematoma, transient hypoparathyroidism, permanent hypoparathyroidism and nerve injury was recorded after operation.Results 353 of 400 patients underwent a total thyroidectomy and central neck dissection (level VI) for thyroid cancer. For L group, the mean operative time was longer than H group (72.62±12.71 minutes vs 69.79±12.36;P=0.044) . Transient hypoparathyroidism was significantly lower in the L group (8 vs 20 patients ; P=0.037). We found no significant differences between the L(n=173) and H(n=180) groups at drainage volume (40.72±15.64mL vs 40.42±16.49 mL; P=0.868) and transient voice damage (5 vs 8 patients ; P=0.45). No patients experienced permanent nerve injury or hypoparathyroidism. Conclusion Both Ligasure vessel sealing system and harmonic scalpel were safe in total thyroidectomy with a single instrument. The complications rate was similar among the two groups. Harmonic scalpel was faster in doing operation. Transient hypoparathyroidism appeared less in using LigaSure device.
Key words:Ligasure vessel sealing system; Harmonic scalpel; Thyroidectomy; Complication
20世o前甲狀腺疾病的手術(shù)死亡率和并發(fā)癥發(fā)病率均較高。隨著外科技術(shù)的進(jìn)步,甲狀腺手術(shù)并發(fā)癥發(fā)生率和死亡率有了很大改善,除了手術(shù)技術(shù)的提升,很大程度得益于更先進(jìn)血管處理技術(shù)。近幾年,在外科手術(shù)過(guò)程中用于阻斷血管的技術(shù)已經(jīng)有了很大進(jìn)展。Ligasure血管閉合系統(tǒng)、超聲刀這兩種設(shè)備均常用于甲狀腺手術(shù),可使外科醫(yī)生在手術(shù)過(guò)程中獲得更好的止血效果和精細(xì)的解剖?;仡櫺匝芯恳呀?jīng)證明在甲狀腺切除術(shù)中使用這兩種手術(shù)設(shè)備與傳統(tǒng)的甲狀腺切除術(shù)(電刀+血管鉗和結(jié)扎)相比可以縮短手術(shù)時(shí)間,減少并發(fā)癥的發(fā)生[1]。我們進(jìn)行了一項(xiàng)單盲前瞻性隨機(jī)試驗(yàn),來(lái)確定采用這2種手術(shù)設(shè)備進(jìn)行甲狀腺手術(shù)在手術(shù)時(shí)間、術(shù)后并發(fā)癥發(fā)生率和術(shù)后切口引流量方面是否有差異。
1 Y料與方法
1.1一般資料 我科從2015年1~12月由于甲狀腺結(jié)節(jié)懷疑甲狀腺癌,需要進(jìn)行雙側(cè)甲狀腺全切除的患者,并同意參加試驗(yàn)的400例患者,在簽署知情同意書(shū)后被納入研究。
1.2步驟 甲狀腺術(shù)前經(jīng)彩超、CT、細(xì)胞學(xué)穿刺評(píng)估無(wú)頸外側(cè)區(qū)淋巴結(jié)轉(zhuǎn)移,所有患者甲狀腺均為II°腫大以下,并有手術(shù)指癥,患者均為第一次手術(shù),術(shù)前喉鏡顯示雙側(cè)聲帶運(yùn)動(dòng)閉合正常,無(wú)聲音嘶啞,血鈣及甲狀旁腺激素正常?;颊弑浑S機(jī)分配至使用L或U血管閉合系統(tǒng)組。根據(jù)患者的隨機(jī)分組,使用LS 1200 LigaSure Precise一次性刀頭(L)或Harmonic FOCUS一次性刀頭(H)。
1.3分組 400例患者在我科由同一位外科醫(yī)生實(shí)施甲狀腺手術(shù),353例術(shù)中確診甲狀腺癌行甲狀腺癌根治術(shù)(雙側(cè)甲狀腺全切除術(shù)+頸VI區(qū)淋巴結(jié)清掃術(shù)),其中173例患者使用LigaSure血管閉合系統(tǒng),180例患者使用超聲刀。
1.4手術(shù)方法和數(shù)據(jù)記錄 所有的手術(shù)麻醉方式均為氣管插管的靜脈全身麻醉,常規(guī)甲狀腺。在頸部正中鎖骨上一橫指處做6~8cm的切口。頸闊肌下游離皮瓣,在頸白線分離帶狀肌,游離甲狀腺。在甲狀腺血管處理中,游離上、中、下靜脈及動(dòng)脈,用Ligasure血管閉合系統(tǒng)或超聲刀離斷。近喉返神經(jīng)及甲狀旁腺處(距離小于2mm處)均采取傳統(tǒng)鉗夾打結(jié)方式,采用可吸收縫線間斷縫合帶狀肌和頸闊肌,Prolene線皮內(nèi)縫合傷口。記錄從切皮至縫合完畢所需手術(shù)時(shí)間,術(shù)后第1d 24h切口引流量,48h內(nèi)有無(wú)切口血腫,術(shù)后5d、1月甲狀旁腺激素水平,術(shù)后7d及3月發(fā)聲情況。
1.5統(tǒng)計(jì)學(xué)方法 采用SPSS19.0軟件計(jì)算數(shù)據(jù)差異,計(jì)量數(shù)據(jù)采用平均值±標(biāo)準(zhǔn)差(x±s)描述。采用t檢驗(yàn)或χ2檢驗(yàn)分析數(shù)據(jù)之間的差異。P
2 結(jié)果
L組和H組在年齡、性別、和甲狀腺重量方面沒(méi)有統(tǒng)計(jì)上的顯著性差異(P>0.05),見(jiàn)表1。
采用Ligasure血管閉合系統(tǒng)或超聲刀實(shí)施了甲狀腺癌根治術(shù),并發(fā)癥出現(xiàn)的患者比例方面無(wú)統(tǒng)計(jì)學(xué)顯著差異,包括一過(guò)性嘶啞、永久性聲帶麻痹、永久性甲狀旁腺功能障礙和術(shù)后切口血腫。但使用Ligasure血管閉合系統(tǒng)出現(xiàn)一過(guò)性甲狀旁腺功能障礙較使用超聲刀少,見(jiàn)表2。
使用Ligasure血管閉合系統(tǒng)使用的手術(shù)時(shí)間略長(zhǎng)于使用超聲刀,見(jiàn)表3。
3 討論
甲狀腺手術(shù)是最常見(jiàn)的內(nèi)分泌外科手術(shù),在手術(shù)過(guò)程中用于阻斷血管的方法已經(jīng)有了重大的技術(shù)進(jìn)展。Ligasure血管閉合系統(tǒng)利用高能液化重組血管壁組織的蛋白質(zhì),最大使直徑達(dá)7 mm血管止血[2]。超聲刀則是使用超聲技術(shù)使高達(dá)5 mm厚的血管壁和組織的蛋白變性,導(dǎo)致凝固,達(dá)到凝閉血管的作用[3]。與Ligasure不同,超聲刀能夠同時(shí)切割組織和凝固組織。兩者的血管閉合性能都非??煽?,這使得Ligasure血管閉合系統(tǒng)和超聲刀近幾年在甲狀腺手術(shù)中應(yīng)用廣泛。
在本研究中,我們比較了Ligasure血管閉合系統(tǒng)和超聲刀進(jìn)行甲狀腺癌根治術(shù)的手術(shù)時(shí)間,發(fā)現(xiàn)L組手術(shù)時(shí)間較U組略長(zhǎng),平均每臺(tái)手術(shù)時(shí)間延長(zhǎng)3 min,雖然Ligasure刀頭和超聲刀刀頭設(shè)計(jì)都是按照人體工程學(xué)設(shè)計(jì)成弧形,這種設(shè)計(jì)令手術(shù)醫(yī)生更容易進(jìn)入深部使用,但Ligasure刀頭前段1~2 mm的凝斷真空區(qū)無(wú)法切斷組織,而且組織凝閉后需要用刀頭內(nèi)自帶刀片切割組織,使得Ligasure刀頭在每次凝斷組織時(shí)都比超聲刀慢1-2秒鐘,另外Ligasure刀頭前段略粗,在甲狀腺手術(shù)上的易用性不如超聲刀頭,故手術(shù)時(shí)間也稍長(zhǎng)于超聲刀。另外,據(jù)報(bào)道,有一項(xiàng)前瞻性隨機(jī)對(duì)照試驗(yàn)針對(duì)需要接受全甲狀腺切除術(shù)的多結(jié)節(jié)甲狀腺腫患者比較了電刀、Ligasure血管閉合系統(tǒng)和超聲刀3種設(shè)備[4]。研究人員發(fā)現(xiàn)手術(shù)中采用超聲刀與Ligasure相比傳統(tǒng)方法可使手術(shù)時(shí)間縮短8 min,但它們兩者間并無(wú)明顯差別。
在許多論文中已經(jīng)證實(shí)了LigaSure血管閉合系統(tǒng)和超聲刀是安全的[1,4-12]。其中包括直接比較LigaSure和超聲刀的回顧性研究。在這項(xiàng)研究中,研究人員發(fā)現(xiàn)兩個(gè)設(shè)備在并發(fā)癥發(fā)生率方面沒(méi)有差別,最常見(jiàn)的并發(fā)癥是一過(guò)性的甲狀旁腺功能減退,有18.9%的患者出現(xiàn),且L組發(fā)生幾率較H組少[6]。這與我們的發(fā)現(xiàn)大致類(lèi)似,本組患者中一過(guò)性甲狀旁腺功能減退的患者比例為7.9%,且L組發(fā)生幾率較H組少。其它并發(fā)癥,如一過(guò)性聲音嘶啞、永久性喉返神經(jīng)損傷、永久性甲狀旁腺功能減退和術(shù)后血腫形成的并發(fā)癥發(fā)生率方面沒(méi)有差別。本組患者因?yàn)槭中g(shù)方法中,在解剖甲狀旁腺時(shí),使用兩種設(shè)備時(shí)會(huì)離甲狀旁腺2 mm距離以上,超聲刀在阻止熱傳導(dǎo)上并沒(méi)有Ligasure設(shè)備做的優(yōu)秀,Ligasure刀頭殼外溫度最高低,而超聲刀溫度功能臂溫度高,在熱傳導(dǎo)損傷幾率上Ligasure較超聲刀低,故一過(guò)性甲狀旁腺功能減退并發(fā)癥發(fā)生率超聲刀明顯多于Ligasure刀頭。令人欣慰的是兩種設(shè)備的術(shù)后遠(yuǎn)期并發(fā)癥并無(wú)明顯差異,說(shuō)明它們都是安全可靠的。
從研究中我們得出結(jié)論,在甲狀腺癌根治術(shù)中使用LigaSure血管閉合系統(tǒng)和超聲刀這兩種設(shè)備是安全的,兩種設(shè)備之間在遠(yuǎn)期并發(fā)癥上沒(méi)有差別,使用Ligasure血管閉合系統(tǒng)比超聲刀出現(xiàn)一過(guò)性甲狀旁腺功能減退的幾率低。使用超聲刀比Ligasure血管閉合系統(tǒng)的手術(shù)操作時(shí)間略短。兩種手術(shù)器械在甲狀腺手術(shù)中各有優(yōu)勢(shì)。
參考文獻(xiàn):
[1]McNally MM,Agle SC,Williams RF,et al.A comparison of two methods of hemostasis in thyroidectomy[J].Am Surg,2009,75:1073-1076.
[2]Youssef T,Mahdy T,F(xiàn)arid M,et al.Thyroid surgery: use of the LigaSure Vessel Sealing System versus conventional knot tying[J].Int J Surg,2008,6:323-327.
[3]Meurisse M,Defechereux T,Maweja S,et al.Evaluation of the Ultracision ultrasonic dissector in thyroid surgery. Prospective randomized study[J].Ann Chir,2000,125:468-472.
[4]Pons Y,Gauthier J,Ukkola-Pons E,et parison of LigaSure vessel sealing system, harmonic scalpel, and conventional hemostasis in total thyroidectomy[J].Otolaryngol Head Neck Surg,2009,141:496-501.
[5]Peker K,Dumanli Ozcan AT,?ahin M,et al.A comparison of total thyroidectomies carried out through LigaSure and Harmonic Scalpel: a retrospective study[J].Turk J Med Sci,2014,44(2):255-260.
[6]Ciftci F,Sakalli E,Abdurrahman I,et al.Parathyroid function following total thyroidectomy using energy devices[J].Eur Arch Otorhinolaryngol, 2015,4.
[7]Peker K,Inal A,Güllü H,et parison of vessel sealing systems with conventional[J].Iran Red Crescent Med J,2013,15(6):488-496.
[8]Cordon C,F(xiàn)ajardo R,Ramirez J,et al.A randomized, prospective, parallel group study comparing the Harmonic Scalpel to electrocautery in thyroidectomy[J].Surgery,2005,137:337-341.
[9]Franko J,Kish KJ,Pezzi CM,et al.Safely increasing the efficiency of thyroidectomy using a new bipolar electrosealing device (LigaSure) versus conventional clamp-andtie technique[J].Am Surg,2006,72:132-136.
[10]Kirdak T,Korun N,Ozguc H.Use of ligasure in thyroidectomy procedures: results of a prospective comparative study[J].World J Surg, 2005,29:771-774.
[11]Kiriakopoulos A, Dimitrios T, Dimitrios L. Use of a diathermy system in thyroid surgery[J]. Arch Surg,2004,139:997-1000.
篇7
第一條為進(jìn)一步提高我市裝備制造業(yè)的整體素質(zhì)和競(jìng)爭(zhēng)力,發(fā)展一批具有綜合研發(fā)配套能力的裝備制造業(yè)企業(yè),特制定本實(shí)施細(xì)則。
第二條本細(xì)則所指的東莞市裝備制造業(yè)發(fā)展專(zhuān)項(xiàng)技術(shù)改造資金是財(cái)政預(yù)算安排的專(zhuān)項(xiàng)資金,用于扶持我市裝備制造業(yè)企業(yè)進(jìn)行技術(shù)改造。
第三條東莞市裝備制造業(yè)發(fā)展專(zhuān)項(xiàng)技術(shù)改造資金由市經(jīng)貿(mào)局、市財(cái)政局共同管理。為體現(xiàn)公平、公正、公開(kāi)原則,申請(qǐng)項(xiàng)目采用評(píng)審制。
第四條東莞市裝備制造業(yè)發(fā)展專(zhuān)項(xiàng)技術(shù)改造資金的使用和管理須遵守國(guó)家有關(guān)法律、行政法規(guī)和相關(guān)規(guī)章制度,遵循誠(chéng)實(shí)申請(qǐng)、公正受理、科學(xué)管理、擇優(yōu)支持、公開(kāi)透明、專(zhuān)款專(zhuān)用的原則。
第二章申報(bào)條件、資金使用范圍與支持方式
第五條申請(qǐng)項(xiàng)目的企業(yè)應(yīng)具備下列條件:
(一)項(xiàng)目承擔(dān)企業(yè)必須是在我市行政區(qū)域內(nèi)經(jīng)工商部門(mén)依法登記注冊(cè),具有獨(dú)立企業(yè)法人資格,以及全部產(chǎn)品或主業(yè)產(chǎn)品屬裝備制造業(yè)產(chǎn)品的企業(yè);
(二)項(xiàng)目承擔(dān)企業(yè)必須具有規(guī)范的生產(chǎn)管理、技術(shù)管理制度,以及健全的財(cái)務(wù)管理機(jī)構(gòu)、嚴(yán)格的財(cái)務(wù)管理制度和合格的財(cái)務(wù)人員,依法納稅;
(三)有必要的專(zhuān)業(yè)技術(shù)人員;
(四)有必要的研究、開(kāi)發(fā)、生產(chǎn)設(shè)備;
(五)申請(qǐng)的技術(shù)改造項(xiàng)目必須在其企業(yè)營(yíng)業(yè)執(zhí)照規(guī)定的范圍內(nèi)。
第六條裝備制造業(yè)發(fā)展專(zhuān)項(xiàng)技術(shù)改造資金的使用范圍:
(一)我市裝備制造業(yè)企業(yè)技術(shù)改造、技術(shù)引進(jìn)消化吸收等項(xiàng)目。
(二)重點(diǎn)扶持且經(jīng)認(rèn)定的市20家裝備制造重點(diǎn)企業(yè)。
(三)配套獲得國(guó)家、省財(cái)政支持的裝備制造業(yè)技術(shù)改造項(xiàng)目。
第七條凡已經(jīng)列入其他同類(lèi)性質(zhì)財(cái)政資金支持的項(xiàng)目,不得重復(fù)申報(bào)。
第三章項(xiàng)目申報(bào)與下達(dá)
第八條裝備制造業(yè)發(fā)展專(zhuān)項(xiàng)技術(shù)改造資金分補(bǔ)助和貸款貼息兩種支持方式。
(一)補(bǔ)助:主要用于裝備制造業(yè)企業(yè)運(yùn)用自有資金進(jìn)行技術(shù)改造并納入市裝備制造業(yè)發(fā)展專(zhuān)項(xiàng)技術(shù)改造項(xiàng)目計(jì)劃的項(xiàng)目,以及用于配套國(guó)家、省重點(diǎn)支持的裝備制造業(yè)技術(shù)改造項(xiàng)目。每個(gè)項(xiàng)目補(bǔ)助總額不超過(guò)50萬(wàn)元。
(二)貸款貼息:對(duì)已落實(shí)銀行貸款并納入市裝備制造業(yè)發(fā)展專(zhuān)項(xiàng)技術(shù)改造項(xiàng)目計(jì)劃的項(xiàng)目,采取貸款貼息的方式予以支持。根據(jù)貸款發(fā)生額,以年應(yīng)付銀行貸款利息的70%給予貼息,最高不超過(guò)100萬(wàn)元。
既有銀行貸款,也有企業(yè)自有資金投入的項(xiàng)目,可以同時(shí)采用以上兩種方式給予支持,具體支持方式以項(xiàng)目實(shí)際投入資金為依據(jù),經(jīng)綜合平衡后確定。
第九條申報(bào)程序:
(一)市20家裝備制造重點(diǎn)企業(yè)及市屬企業(yè)的項(xiàng)目,直接向市經(jīng)貿(mào)局、市財(cái)政局申報(bào)。
(二)各鎮(zhèn)(區(qū))企業(yè)的項(xiàng)目,由鎮(zhèn)(區(qū))經(jīng)貿(mào)辦和財(cái)政分局對(duì)本鎮(zhèn)(區(qū))企業(yè)的申報(bào)材料進(jìn)行聯(lián)合初審匯總后向市經(jīng)貿(mào)局、市財(cái)政局申報(bào)。
(三)申請(qǐng)企業(yè)需提交以下材料:
1、《東莞市技術(shù)改造項(xiàng)目計(jì)劃申請(qǐng)書(shū)》及電子文本;
2、項(xiàng)目可行性研究報(bào)告(主要包括企業(yè)基本情況、項(xiàng)目意義及必要性、項(xiàng)目產(chǎn)品的市場(chǎng)需求分析、項(xiàng)目技術(shù)改造的具體內(nèi)容、技術(shù)指標(biāo)、工藝流程、項(xiàng)目投資估算、資金籌措及來(lái)源渠道、成本和經(jīng)濟(jì)效益分析、技術(shù)改造前后技術(shù)水平和經(jīng)濟(jì)效益的對(duì)比分析、風(fēng)險(xiǎn)度分析、項(xiàng)目進(jìn)度安排、其他情況說(shuō)明等內(nèi)容)及電子文本;
3、含貸款的項(xiàng)目,須附上承貸銀行出具的貸款合同及合同項(xiàng)下的借據(jù)、銀行劃款憑證和利息結(jié)算清單,或銀行出具編文件號(hào)的有效的貸款承諾函(復(fù)印件);
4、與項(xiàng)目有關(guān)的其他資料(如相關(guān)批準(zhǔn)文件、各種認(rèn)證證書(shū)、環(huán)評(píng)報(bào)告等);
5、企業(yè)上一年度財(cái)務(wù)報(bào)表(包括資產(chǎn)負(fù)債表、利潤(rùn)表、現(xiàn)金流量表)以及申報(bào)前一個(gè)月的財(cái)務(wù)報(bào)表(包括資產(chǎn)負(fù)債表、利潤(rùn)表),所有報(bào)表須加蓋企業(yè)公章;
6、企業(yè)營(yíng)業(yè)執(zhí)照復(fù)印件。
第十條經(jīng)受理審查合格的項(xiàng)目,由市經(jīng)貿(mào)局組織有關(guān)專(zhuān)家進(jìn)行評(píng)審,會(huì)同財(cái)政局根據(jù)專(zhuān)家評(píng)審意見(jiàn)以及綜合平衡,擬定立項(xiàng)項(xiàng)目和支持額度,報(bào)市政府批準(zhǔn)后聯(lián)合下達(dá)資金安排。
第十一條經(jīng)批準(zhǔn)立項(xiàng)的裝備制造業(yè)發(fā)展專(zhuān)項(xiàng)技術(shù)改造項(xiàng)目,由市經(jīng)貿(mào)局與項(xiàng)目承擔(dān)企業(yè)簽訂項(xiàng)目合同書(shū),確定具體條款。
第十二條專(zhuān)項(xiàng)資金安排由市財(cái)政局和經(jīng)貿(mào)局聯(lián)合下達(dá)。市屬企業(yè)項(xiàng)目獲安排的資金由市財(cái)政局直接撥付,鎮(zhèn)(區(qū))屬企業(yè)項(xiàng)目獲安排的資金由市財(cái)政局下?lián)芙o鎮(zhèn)(區(qū))財(cái)政分局,再轉(zhuǎn)撥到項(xiàng)目承擔(dān)企業(yè)。
第十三條項(xiàng)目承擔(dān)企業(yè)收到專(zhuān)項(xiàng)資金后,應(yīng)按照國(guó)家有關(guān)制度進(jìn)行會(huì)計(jì)處理。
(一)收到貼息金,應(yīng)按照《企業(yè)會(huì)計(jì)準(zhǔn)則—借款費(fèi)用》規(guī)定,區(qū)別利息資本化或費(fèi)用化進(jìn)行處理。利息資本化的,收到相應(yīng)的貼息金,在不超過(guò)利息資本化金額范圍內(nèi)沖減在建工程成本,超過(guò)部分沖減財(cái)務(wù)費(fèi)用;利息費(fèi)用化的,收到相應(yīng)的貼息金,沖減財(cái)務(wù)費(fèi)用;
(二)收到補(bǔ)助金,應(yīng)按照會(huì)計(jì)制度的規(guī)定,作為專(zhuān)項(xiàng)應(yīng)付款反映和核算;
(三)資金的開(kāi)支范圍包括項(xiàng)目管理費(fèi)、項(xiàng)目費(fèi)、經(jīng)財(cái)政部門(mén)批準(zhǔn)開(kāi)支的其他費(fèi)用。
第四章監(jiān)督管理與驗(yàn)收
第十四條建立項(xiàng)目定期報(bào)告制度。各項(xiàng)目承擔(dān)企業(yè)應(yīng)在每年3月底前向市經(jīng)貿(mào)局、市財(cái)政局報(bào)告本企業(yè)上年度項(xiàng)目總投入資金、財(cái)政資金使用情況,項(xiàng)目進(jìn)度執(zhí)行情況,項(xiàng)目達(dá)到的技術(shù)、經(jīng)濟(jì)、質(zhì)量指標(biāo)情況,經(jīng)濟(jì)效益、存在問(wèn)題和解決措施等情況。
第十五條由市財(cái)政局會(huì)同市經(jīng)貿(mào)局負(fù)責(zé)對(duì)專(zhuān)項(xiàng)資金支持項(xiàng)目實(shí)施情況的管理和監(jiān)督,定期或不定期對(duì)項(xiàng)目進(jìn)行檢查,發(fā)現(xiàn)問(wèn)題及時(shí)解決。對(duì)項(xiàng)目的監(jiān)督檢查應(yīng)依法辦事,不得干預(yù)用款單位正常的生產(chǎn)經(jīng)營(yíng)活動(dòng)。被檢查的用款單位應(yīng)主動(dòng)配合檢查人員做好相關(guān)工作,提供相應(yīng)的文件、資料,不得阻礙檢查工作的正常進(jìn)行。
第十六條獲得資金支持的項(xiàng)目,在實(shí)施過(guò)程中如確需要改變技術(shù)方案,項(xiàng)目承擔(dān)者必須預(yù)先向市經(jīng)貿(mào)局提交情況說(shuō)明報(bào)告,經(jīng)市經(jīng)貿(mào)局審核批準(zhǔn)后方可改動(dòng);因特殊原因需要中途撤銷(xiāo)或失敗的項(xiàng)目,必須要如實(shí)提供詳細(xì)的情況說(shuō)明報(bào)告,由市經(jīng)貿(mào)局、市財(cái)政局聯(lián)合作出處理結(jié)論。
第十七條項(xiàng)目承擔(dān)企業(yè)要對(duì)技術(shù)改造資金實(shí)行專(zhuān)帳核算、專(zhuān)帳管理。專(zhuān)項(xiàng)資金必須專(zhuān)款專(zhuān)用,對(duì)弄虛作假、截留、挪用等行為,采取撤銷(xiāo)項(xiàng)目、追回項(xiàng)目全部財(cái)政資金的處理,構(gòu)成犯罪的,將移交司法機(jī)關(guān)依法追究有關(guān)責(zé)任人員的法律責(zé)任。
第十八條項(xiàng)目承擔(dān)企業(yè)應(yīng)在項(xiàng)目完工后3個(gè)月內(nèi)向市經(jīng)貿(mào)局提出驗(yàn)收申請(qǐng),并提交相關(guān)的驗(yàn)收材料,提交的基本材料如下:
(一)驗(yàn)收申請(qǐng)書(shū);
(二)項(xiàng)目實(shí)施總結(jié)報(bào)告。主要包括兩方面的內(nèi)容:一是項(xiàng)目技術(shù)改造的主要內(nèi)容、采用的技術(shù)方案、進(jìn)展情況、技術(shù)指標(biāo)完成情況、應(yīng)用效果、項(xiàng)目技改前后的技術(shù)水平對(duì)比分析;二是資金落實(shí)與使用的具體情況、項(xiàng)目經(jīng)濟(jì)指標(biāo)完成情況、技改前后的經(jīng)濟(jì)效益對(duì)比分析;
(三)技術(shù)改造資金決算明細(xì)表。
第十九條市經(jīng)貿(mào)局收到承擔(dān)企業(yè)提供完整的項(xiàng)目驗(yàn)收材料后,應(yīng)及時(shí)組織驗(yàn)收工作,由項(xiàng)目驗(yàn)收小組提出書(shū)面驗(yàn)收意見(jiàn),報(bào)市經(jīng)貿(mào)局、市財(cái)政局備案。
第二十條由市經(jīng)貿(mào)局每年從市裝備制造業(yè)發(fā)展專(zhuān)項(xiàng)技術(shù)改造資金中安排3%的經(jīng)費(fèi),用于調(diào)研、評(píng)審、跟蹤、驗(yàn)收和培訓(xùn)等管理活動(dòng),并據(jù)實(shí)列支。
第五章附則
篇8
農(nóng)村房屋裝修合同書(shū)
發(fā)包方(簡(jiǎn)稱甲方):_________
承包方(簡(jiǎn)稱乙方):_________
根據(jù)《中華人民共和國(guó)合同法》、《建筑安裝工程承包合同條例》、《中華人民共和國(guó)消費(fèi)者權(quán)益保護(hù)法》、《中華人民共和國(guó)價(jià)格法》、《xx市保護(hù)消費(fèi)合法權(quán)益條例》,中華人民共和國(guó)建設(shè)部(1997)92號(hào)文《家庭居室裝飾裝修管理試行辦法》以及其他有關(guān)法律法規(guī)規(guī)定的原則,為保護(hù)雙方的合法權(quán)益,結(jié)合本工程的具體情況,雙方達(dá)成如下協(xié)議,共同遵守。
一、概況
1、甲方裝飾住房系合法居住。乙方為本市經(jīng)工商行政管理機(jī)關(guān)核準(zhǔn)登記并經(jīng)市建委有關(guān)部門(mén)審定具有民用裝飾《資質(zhì)證書(shū)》的企業(yè)法人。
2、裝飾施工地點(diǎn):__區(qū)(縣)____路____弄(村)____號(hào)____樓_____室。
3、住房結(jié)構(gòu):____房型____房____廳____套,施工面積____平方米。
4、裝飾施工內(nèi)容:詳見(jiàn)附件一《裝飾施工內(nèi)容表》。
5、承包方式:____(包工包料、清包工、部分承包)。
6、總價(jià)款:¥____元,大寫(xiě)(人民幣):____
其中:材料費(fèi):___,人工費(fèi):__;管理費(fèi):___,設(shè)計(jì)費(fèi):____;垃圾清運(yùn)費(fèi):___,稅金(3.41%):___;其他費(fèi)用:____。經(jīng)雙方認(rèn)可,變更施工內(nèi)容,變更部分的工程款按實(shí)另計(jì)。
7、工期:自____年____月___日開(kāi)工,至____年___月____日竣工,工期___天。
二、關(guān)于材料供應(yīng)的約定:
1、甲方提供的材料:詳見(jiàn)附件二《甲方提供材料、設(shè)備表》。
本工程甲方負(fù)責(zé)采購(gòu)供應(yīng)的材料、設(shè)備,應(yīng)為符合設(shè)計(jì)要求的合格產(chǎn)品,并應(yīng)按時(shí)供應(yīng)到現(xiàn)場(chǎng),乙方應(yīng)辦理驗(yàn)收手續(xù)。如甲方供應(yīng)的材料、設(shè)備發(fā)生質(zhì)量問(wèn)題或規(guī)格差異,乙方應(yīng)及時(shí)向甲方書(shū)面提出,甲方仍表示使用的,由此造成工程損失的,責(zé)任由甲方承擔(dān)。
甲方供應(yīng)的材料抵現(xiàn)場(chǎng)后,經(jīng)乙方驗(yàn)收,由乙方負(fù)責(zé)保管,乙方可收取甲方提供材料價(jià)款保管費(fèi),費(fèi)率由雙方約定,由于保管不當(dāng)造成的損失,由乙方負(fù)責(zé)賠償。
2、乙方提供的材料:詳見(jiàn)附件三《主材料報(bào)價(jià)單》。
3、乙方對(duì)甲方采購(gòu)的裝飾材料、設(shè)備,均應(yīng)用于本合同規(guī)定的住宅裝飾,非經(jīng)甲方同意,不得挪作他用。如乙方違反此規(guī)定,應(yīng)按挪用材料、設(shè)備價(jià)款的雙倍補(bǔ)償給甲方。
4、乙方供應(yīng)的材料、設(shè)備,如不符合質(zhì)量要求或規(guī)格有差異,應(yīng)禁止使用。如已使用,對(duì)工程造成的損失由乙方負(fù)責(zé)。
如乙方提供的材料、設(shè)備系偽劣商品,應(yīng)按材料、設(shè)備價(jià)款的雙倍補(bǔ)償給甲方。
三、關(guān)于工程質(zhì)量及驗(yàn)收的約定:
1、本工程執(zhí)行DBJ08-62-97《住宅建筑裝飾工程技術(shù)規(guī)程》、DB31/T30-1999《住宅裝飾裝修驗(yàn)收標(biāo)準(zhǔn)》和市建設(shè)行政主管部門(mén)制定的其它地方標(biāo)準(zhǔn)、質(zhì)量評(píng)定驗(yàn)收標(biāo)準(zhǔn)。
2、本工程由_____方設(shè)計(jì)施工方案。
3、甲方提供的材料、設(shè)備質(zhì)量不合格而影響工程質(zhì)量,其返工費(fèi)用由甲方承擔(dān),工期順延。
4、由于乙方原因造成質(zhì)量事故,其返工費(fèi)用由乙方承擔(dān),工期不變。
5、在施工過(guò)程中,甲方提出設(shè)計(jì)修改意見(jiàn)及增減工程項(xiàng)目時(shí)須提前與乙方聯(lián)系,在簽訂《工程項(xiàng)目變更單》(詳見(jiàn)附件見(jiàn))后,方能進(jìn)行該項(xiàng)目的施工,由此影響竣工日期甲、乙雙方商定。
凡甲方私自與工人商定更改施工內(nèi)容所引起的一切后果,甲方自負(fù),給乙方造成損失的,甲方應(yīng)予賠償。
6、工程驗(yàn)收:甲、乙雙方應(yīng)及時(shí)辦理隱蔽工程和中間工程的檢查與驗(yàn)收手續(xù),甲方不能按預(yù)約規(guī)定日期參加驗(yàn)收,由乙方組織人員進(jìn)行驗(yàn)收,甲方應(yīng)予承認(rèn)。
事后,若甲方要求復(fù)驗(yàn),乙方應(yīng)按要求辦理復(fù)驗(yàn)。若復(fù)驗(yàn)合格,其復(fù)驗(yàn)及返工費(fèi)用由甲方承擔(dān),工期也予順延。
7、工程竣工:乙方應(yīng)提前三天通知甲方驗(yàn)收,甲方應(yīng)自接到通知三日內(nèi)組織驗(yàn)收,并辦理驗(yàn)收移交手續(xù)(詳見(jiàn)附件《工程質(zhì)量驗(yàn)收單》)。
如甲方在規(guī)定時(shí)間內(nèi)不能組織驗(yàn)收須及時(shí)通知乙方,另定驗(yàn)收日期。如通過(guò)竣工驗(yàn)收,甲方應(yīng)承認(rèn)原竣工日期,并承擔(dān)乙方的看管費(fèi)用和其他相關(guān)費(fèi)用。
四、有關(guān)安全生產(chǎn)和防火約定:
甲方提供的施工圖紙做法說(shuō)明及施工場(chǎng)地應(yīng)符合防火、防事故的要求,主要包括電氣線路、煤氣管道、自來(lái)水和其它管道暢通、合格。
乙方在施工中應(yīng)采取必要的安全防護(hù)和消防措施,保障作業(yè)人員及相鄰居民的安全,防止相鄰居民住房的管道堵塞、滲漏水、停電、物品毀壞等事故發(fā)生。
如遇上述情況發(fā)生,屬甲方責(zé)任的,甲方負(fù)責(zé)和賠償;屬于乙方責(zé)任的,乙方負(fù)責(zé)修復(fù)和賠償。
五、關(guān)于工程價(jià)款及結(jié)算的約定:
1、工程款付款方式列下表(略):
2、工程結(jié)算:詳見(jiàn)附件六《工程結(jié)算單》。
3、工程保修期壹年。須工程款全部結(jié)清,甲、乙雙方方能簽訂《工程保修單》(詳見(jiàn)附件七),保修期從竣工驗(yàn)收簽章之日起算。
4、雙方款項(xiàng)往來(lái),均應(yīng)出具收據(jù),施工結(jié)束須開(kāi)具發(fā)票。
甲方簽字:______________乙方簽字:______________
簽訂日期:____________
農(nóng)村房屋裝修合同參考
甲方:________________
乙方:________________
雙方本著友好合作的態(tài)度,按照《合同法》等相關(guān)法律,在平等公正的情況下簽定如下合同:
一、工程概況
工程地址:________________
二、價(jià)格
工費(fèi):¥____________
三、付款方式
1.施工隊(duì)進(jìn)場(chǎng),付首期款。
2.瓦工完成,經(jīng)甲方驗(yàn)收合格,付中期款。
3.工程竣工,經(jīng)物業(yè),甲方驗(yàn)收合格,付剩余款。
四、設(shè)計(jì)
1.甲方若有圖紙須向乙方提供圖紙一套。
2.甲方若無(wú)圖紙,須向乙方交代清楚要求,乙方施工前須畫(huà)草圖讓甲方認(rèn)可。
五、材料
1.乙方應(yīng)提前7天向甲方提供需購(gòu)材料清單,甲方應(yīng)在7天內(nèi)及時(shí)采購(gòu)材料供施工隊(duì)使用, 雙方應(yīng)各自承擔(dān)各自拖延工期的責(zé)任和經(jīng)濟(jì)損失。
2.乙方自行采購(gòu)的材料需甲方認(rèn)可方可使用。
3.乙方應(yīng)驗(yàn)收甲方所購(gòu)建材的質(zhì)量,發(fā)現(xiàn)質(zhì)量問(wèn)題應(yīng)及時(shí)向甲方說(shuō)明。
4.乙方應(yīng)協(xié)助甲方收貨,核對(duì)數(shù)量和配件的準(zhǔn)確性。
5.乙方應(yīng)做好對(duì)施工完成的成品保護(hù)工作。
6.未經(jīng)甲方許可,乙方不得攜帶任何甲方建材出門(mén),若發(fā)現(xiàn)此類(lèi)現(xiàn)象,按材料價(jià)格加倍從人工費(fèi)中扣除。
7.甲方有權(quán)增加或減少裝修項(xiàng)目,加項(xiàng)時(shí)與乙方協(xié)商價(jià)格、材料等事宜。
六、工期
從 _________年_______月_______日起至_______年_______月_______日止,工期為_(kāi)______天,因甲方因素拖延,工期順延,因乙方因素拖延工期,甲方可扣除乙方人工費(fèi) 元/天。
七、材料搬運(yùn)
甲方材料送至工程所在地的樓下,乙方施工人員應(yīng)協(xié)助搬運(yùn),甲方適當(dāng)付費(fèi)。
八、垃圾清運(yùn)
1.垃圾袋裝化。
2.垃圾應(yīng)日日清。
3.垃圾應(yīng)由乙方清運(yùn)至物業(yè)指定的垃圾堆放場(chǎng)所。
九、勞動(dòng)力管理
1.開(kāi)工前乙方應(yīng)向甲方提供所有施工人員的身份證復(fù)印件。
2.未經(jīng)甲方許可,工地施工人員及非工地施工人員不得在工地過(guò)夜。
3.乙方應(yīng)具備在北京市暫住的一切證件,因證件不全引起的相關(guān)損失由乙方自行承擔(dān)。
乙方指定由 _______為工地現(xiàn)場(chǎng)負(fù)責(zé)人, _______為替補(bǔ)負(fù)責(zé)人。
4.乙方未經(jīng)甲方同意不得任意調(diào)換施工人員,每天工地現(xiàn)場(chǎng)必須保持2(1人)人以上的施工人員。
5.未經(jīng)甲方同意,任何情況下乙方不得停工或殆工。停工一天扣除乙方人工費(fèi)_______元/天。
十、施工機(jī)具
乙方自帶施工所需工具,并保證工具的安全性和良好使用性,乙方自行承擔(dān)工具維修費(fèi)。
十一、工地現(xiàn)場(chǎng)管理
1.現(xiàn)場(chǎng)禁止使用明火,乙方配備滅火器。
2.現(xiàn)場(chǎng)禁止吸煙。油漆材料必須和其他材料分開(kāi)放置。
3.乙方要愛(ài)護(hù)甲方家中物品,損壞時(shí)負(fù)責(zé)修復(fù)并恢復(fù)原樣,并賠償全部損失。
十二、維修
1.因乙方施工原因?qū)е碌馁|(zhì)量問(wèn)題,乙方應(yīng)在_______年內(nèi)無(wú)償維修。
2.普通維修乙方應(yīng)在甲方通知乙方后_______天內(nèi)及時(shí)維修,特殊情況(水、電問(wèn)題)乙方 必須在_______小時(shí)內(nèi)趕到并維修。
3.若因乙方未能按合同及時(shí)完成維修,甲方可以安排其他施工隊(duì)進(jìn)行維修工作,所產(chǎn)生的人工費(fèi)用由乙方支付。
十三、合同附件
1.家裝合同施工項(xiàng)目、報(bào)價(jià)單。
2.乙方開(kāi)出的材料采購(gòu)清單。
十四、合同爭(zhēng)議
1.本家裝合同與xx市家裝合同具備同等法律效力,簽字蓋章有效。出現(xiàn)爭(zhēng)議甲乙雙方先協(xié)商,按合同約定處理。
2.協(xié)商不成可向爭(zhēng)議所在地法院提起訴訟。
甲方簽字:______________乙方簽字:______________
簽訂日期:____________
房屋裝修合同簡(jiǎn)潔版
發(fā)包方(以下簡(jiǎn)稱甲方):_________
承包方(以下簡(jiǎn)稱乙方):_________
依照《中華人民共和國(guó)合同法》及其它有關(guān)法律、法規(guī)的規(guī)定,甲、乙雙方在平等、自愿、協(xié)商一致的基礎(chǔ)上,為保證工程順利進(jìn)行,特簽訂本合同(包括本合同附件和所有補(bǔ)充合同),以便共同遵守。
第一條 工程概況
1.1 工程地點(diǎn):_________市_________區(qū)(縣)_________路_________號(hào)_________樓_________室。
1.2 住房結(jié)構(gòu):_________房型_________房_________廳_________套,施工面積_________平方米。
1.3 工程承包方式,雙方商定采取下列第_________種承包方式:
(1)乙方包工、包全部材料(見(jiàn)附表五:乙方提供裝飾裝修材料明細(xì)表);
(2)乙方包工、部分包料,甲方提供部分材料(見(jiàn)附表四:甲方提供裝飾裝修材料明細(xì)表,附表五:乙方提供裝飾裝修材料明細(xì)表);
(3)乙方包工、甲方包全部材料(見(jiàn)附表四:甲方提供裝飾裝修材料明細(xì)表)。
1.4 總價(jià)款:_________元,大寫(xiě)(人民幣):_________。其中:材料費(fèi):_________,人工費(fèi):_________,管理費(fèi):_________,設(shè)計(jì)費(fèi):_________,垃圾清運(yùn)費(fèi):_________,稅金:_________,其他費(fèi)用:_________。(詳見(jiàn)附表三:家庭居室裝飾裝修工程報(bào)價(jià)單)。經(jīng)雙方認(rèn)可,變更施工內(nèi)容,變更部分的工程款按實(shí)另計(jì)。
1.5 工程期限_________天;開(kāi)工日期_________天_________月_________日;竣工日期_________天_________月_________日;
1.6 工程內(nèi)容及做法(見(jiàn)附表一:裝飾裝修工程施工項(xiàng)目確認(rèn)表、附表二:裝飾裝修工程內(nèi)容和做法一覽表)。
第二條 施工單位資格
乙方是經(jīng)過(guò)工商行政管理機(jī)關(guān)核準(zhǔn)登記的企業(yè)法人,通過(guò)最近一次企業(yè)年檢,具有經(jīng)建設(shè)行政主管機(jī)關(guān)審定的從事民用建筑裝飾裝修工程的資質(zhì),資質(zhì)等級(jí)符合本次施工的要求。乙方不具備營(yíng)業(yè)資格或相應(yīng)資質(zhì)的,甲方有權(quán)終止本合同,乙方應(yīng)當(dāng)立即返還甲方已支付的費(fèi)用,并賠償乙方損失。
第三條 材料供應(yīng)
3.1 按合同約定由甲方提供的材料、設(shè)備(見(jiàn)附表四:甲方提供裝飾裝修材料明細(xì)表),甲方應(yīng)在材料到施工現(xiàn)場(chǎng)前通知乙方,雙方共同驗(yàn)收并辦理交接手續(xù);
3.2 按合同約定由乙方提供的材料、設(shè)備(見(jiàn)附表五:乙方提供裝飾裝修材料明細(xì)表),乙方應(yīng)在材料到施工現(xiàn)場(chǎng)前通知甲方,雙方共同驗(yàn)收。
第四條 工程質(zhì)量
4.1 本工程執(zhí)行_________(填建筑裝飾工程技術(shù)規(guī)程)、_________(填裝飾裝修驗(yàn)收標(biāo)準(zhǔn))和市建設(shè)行政主管部門(mén)制定的其它地方標(biāo)準(zhǔn)、質(zhì)量評(píng)定驗(yàn)收標(biāo)準(zhǔn)。
4.2 本工程由_________方設(shè)計(jì)施工方案。
4.3 甲方提供的材料、設(shè)備質(zhì)量不合格而影響工程質(zhì)量,其返工費(fèi)用由甲方承擔(dān),工期順延。
4.4 由于乙方原因造成質(zhì)量事故,其返工費(fèi)用由乙方承擔(dān),工期不變。
4.5 在施工過(guò)程中,甲方提出設(shè)計(jì)修改意見(jiàn)及增減工程項(xiàng)目時(shí)須提前與乙方聯(lián)系。在簽訂《工程項(xiàng)目變更單》(詳見(jiàn)附件見(jiàn))后,方能進(jìn)行該項(xiàng)目的施工。由此影響竣工日期的,由甲、乙雙方商定。凡甲方私自與工人商定更改施工內(nèi)容所引起的一切后果,由甲方自負(fù),給乙方造成損失的,甲方應(yīng)予賠償。
4.6 施工過(guò)程中雙方對(duì)工程質(zhì)量發(fā)生爭(zhēng)議,申請(qǐng)由_________部門(mén)對(duì)工程質(zhì)量予以認(rèn)證,經(jīng)認(rèn)證工程質(zhì)量不符合合同約定的標(biāo)準(zhǔn),認(rèn)證過(guò)程支出的相關(guān)費(fèi)用由乙方負(fù)責(zé),經(jīng)認(rèn)證工程質(zhì)量符合合同約定的標(biāo)準(zhǔn),認(rèn)證過(guò)程支出的相關(guān)費(fèi)用由甲方負(fù)責(zé)。
第五條 工程驗(yàn)收
5.1 雙方約定在施工過(guò)程中分下列幾個(gè)階段對(duì)工程質(zhì)量進(jìn)行驗(yàn)收:_________。
乙方應(yīng)提前_________天通知甲方參加驗(yàn)收,階段驗(yàn)收合格后應(yīng)填寫(xiě)工程驗(yàn)收單(見(jiàn)附表八:工程驗(yàn)收單);
5.2 工程竣工后,乙方應(yīng)通知甲方驗(yàn)收,甲方應(yīng)自接到驗(yàn)收通知后兩天內(nèi)組織驗(yàn)收,填寫(xiě)工程驗(yàn)收單(見(jiàn)附表八:工程驗(yàn)收單)。在工程款結(jié)清后,辦理移交手續(xù)(見(jiàn)附表九:工程結(jié)算單);
5.3 本工程自驗(yàn)收合格雙方簽字之日起保修期為_(kāi)________年。驗(yàn)收合格簽字后,填寫(xiě)工程保修單(見(jiàn)附表十:工程保修單)。
第六條 工程款支付方式
6.1 雙方約定按下列第_________種方式支付工程款:
(1)本合同簽訂后,開(kāi)工前_________至_________日,甲方支付相當(dāng)于總價(jià)款_________%的工程款;
(2)完成_________%的工程量之日后的_________日內(nèi),甲方支付相當(dāng)于總價(jià)款_________%的工程款;
(3)竣工驗(yàn)收后_________日內(nèi),甲方支付相當(dāng)于總價(jià)款_________%的工程款。
(4)竣工驗(yàn)收合格_________年后或雙方約定的保修期滿,甲方支付相當(dāng)于總價(jià)款_________%的工程款。
甲方支付工程款,乙方的業(yè)務(wù)員或施工人員收取的,視為乙方收取。
6.2 因變更施工內(nèi)容導(dǎo)致總價(jià)款增減的,甲方在竣工驗(yàn)收合格之日支付或收取增、減部分的款項(xiàng)。
6.3 雙方款項(xiàng)往來(lái),均應(yīng)出具收據(jù)。施工結(jié)束,甲方全額付清應(yīng)付款項(xiàng)后,乙方應(yīng)當(dāng)出具合法發(fā)票。
6.4 竣工驗(yàn)收合格后,甲方有權(quán)留取相當(dāng)于工程總價(jià)款的_________%的保修基金。竣工驗(yàn)收合格后_________年內(nèi)沒(méi)有發(fā)生工程質(zhì)量問(wèn)題的,甲方應(yīng)將保修基金全額退還乙方。
第七條 有關(guān)安全生產(chǎn)和防火約定
甲方提供的施工圖紙做法說(shuō)明及施工場(chǎng)地應(yīng)符合防火、防事故的要求,主要包括電氣線路、煤氣管道、自來(lái)水和其它管道暢通、合格。乙方在施工中應(yīng)采取必要的安全防護(hù)和消防措施,保障作業(yè)人員及相鄰居民的安全,防止相鄰居民住房的管道堵塞、滲漏水、停電、物品毀壞等事故發(fā)生。如遇上述情況發(fā)生,屬甲方責(zé)任的,甲方負(fù)責(zé)和賠償;屬于乙方責(zé)任的,乙方負(fù)責(zé)修復(fù)和賠償。
第八條 工程監(jiān)理
8.1 本工程甲方委托監(jiān)理,應(yīng)與監(jiān)理單位簽訂監(jiān)理合同。并在本合同協(xié)議條款內(nèi)明確監(jiān)理單位、總監(jiān)理工程師及其應(yīng)履行的職責(zé)。
8.2 本合同中總監(jiān)理工程師和甲方代表的職責(zé)不能相互交叉。非經(jīng)甲方同意,總監(jiān)理工程師及其代表無(wú)權(quán)解除本合同中乙方的任何義務(wù)。合同履行中,發(fā)生影響甲、乙雙方權(quán)利和義務(wù)的事件時(shí),總監(jiān)理工程師應(yīng)作出公正的處理。
8.3 為保證施工正常進(jìn)行,甲乙雙方應(yīng)尊重總監(jiān)理工程師的決定。對(duì)總監(jiān)理工程師的決定有異議時(shí),按協(xié)議條款的約定處理。總監(jiān)理工程師易人,甲方接到監(jiān)理單位通知后應(yīng)同時(shí)通知乙方,后任繼續(xù)履行賦予前任的權(quán)利和義務(wù)。
第九條 施工圖紙
雙方商定施工圖紙采取下列第_________種方式提供:
9.1 甲方在開(kāi)工日期_________天之前按協(xié)議條款約定的日期和份數(shù),向乙方提供完整的施工圖紙。乙方需要超過(guò)協(xié)議條款雙方約定的圖紙份數(shù),甲方應(yīng)代為復(fù)制,復(fù)制費(fèi)用由乙方承擔(dān)。
9.2 甲方委托乙方設(shè)計(jì)施工圖紙,圖紙一式_________份,甲方、乙方、施工隊(duì)各執(zhí)一份(見(jiàn)附表六:家庭居室裝飾裝修工程設(shè)計(jì)圖紙),設(shè)計(jì)費(fèi)_________元由甲方支付(此費(fèi)用不在工程價(jià)款內(nèi))。
9.3 使用境外圖紙,不能滿足施工需要時(shí),雙方應(yīng)在協(xié)議條款內(nèi)約定復(fù)制、重新繪制、翻譯、購(gòu)買(mǎi)標(biāo)準(zhǔn)圖紙等事項(xiàng)。
第十條 乙方駐工地代表
乙方任命駐工地負(fù)責(zé)人,按以下要求行使合同約定的權(quán)利,履行合同約定的義務(wù):
10.1 乙方的要求、請(qǐng)求和通知,以書(shū)面形式由乙方代表簽字后送甲方代表,甲方代表在回執(zhí)行上簽署姓名及收到時(shí)間后生效。
10.2 乙方代表按甲方代表批準(zhǔn)的施工組織設(shè)計(jì)(或施工方案)和依據(jù)合同發(fā)出的指令、要求組織施工。在情況緊急且無(wú)法與甲方代表聯(lián)系的情況下,可采取保護(hù)人員生命和工程、財(cái)產(chǎn)安全的緊急措施,并在采取措施后24小時(shí)內(nèi)向甲方代表送交報(bào)告。責(zé)任在甲方,由甲方承擔(dān)由此發(fā)生的追加合同價(jià)款,相應(yīng)順延工期;責(zé)任在乙方,由乙方承擔(dān)費(fèi)用。
10.3 乙方代表易人,乙方應(yīng)于易人前_________天通知甲方,后任繼續(xù)履行合同文件約定的前任的權(quán)利和義務(wù)。
第十一條 甲方工作
11.1 甲方應(yīng)在開(kāi)工前_________天,向乙方提供經(jīng)物業(yè)管理部門(mén)認(rèn)可的施工圖紙或做法說(shuō)明_________份,并向乙方進(jìn)行現(xiàn)場(chǎng)交底。全部騰空或部分騰空房屋,清除影響施工的障礙物。對(duì)只能部分騰空的房屋中所滯留的家具、陳設(shè)等應(yīng)采取保護(hù)措施。向乙方提供施工需用的水、電等必備條件,并說(shuō)明使用注意事項(xiàng)。
11.2 做好施工中因臨時(shí)性使用公用部位操作以及產(chǎn)生影響鄰里關(guān)系等的協(xié)調(diào)工作。
11.3 如確實(shí)需要拆改原建筑結(jié)構(gòu)或設(shè)計(jì)管線,負(fù)責(zé)到所在地房管部門(mén)或物業(yè)管理部門(mén)辦理相應(yīng)審批手續(xù),并承擔(dān)有關(guān)費(fèi)用。
11.4 不拆動(dòng)室內(nèi)承重結(jié)構(gòu),如需拆改原建筑的非承重結(jié)構(gòu)或設(shè)備管線,負(fù)責(zé)到有關(guān)部門(mén)辦理相應(yīng)的審批手續(xù);
11.5 施工期間甲方仍需部分使用該居室的,負(fù)責(zé)做好施工現(xiàn)場(chǎng)的保衛(wèi)及消防等項(xiàng)工作;
11.6 參與工程質(zhì)量和施工進(jìn)度的監(jiān)督,負(fù)責(zé)材料進(jìn)場(chǎng)、工程竣工驗(yàn)收。
第十二條 乙方工作
12.1 施工中嚴(yán)格執(zhí)行安全施工操作規(guī)范、防火規(guī)定、施工規(guī)范及質(zhì)量標(biāo)準(zhǔn),按期保質(zhì)完成工程;
12.2 嚴(yán)格執(zhí)行本市有關(guān)施工現(xiàn)場(chǎng)管理的規(guī)定,不得擾民及污染環(huán)境;
12.3 保護(hù)好原居室室內(nèi)的家具和陳設(shè),保證居室內(nèi)上、下水管道的暢通;
12.4 保證施工現(xiàn)場(chǎng)的整潔,工程完工后負(fù)責(zé)清掃施工現(xiàn)場(chǎng)。
12.5 參加甲方組織的施工圖紙或做法說(shuō)明現(xiàn)場(chǎng)交底。
12.6 指派_________為乙方駐工地代表,負(fù)責(zé)合同履行。按要求組織施工,保質(zhì)、保量、按期完成施工任務(wù),解決由乙方負(fù)責(zé)的各項(xiàng)事宜,對(duì)其行為乙方應(yīng)予認(rèn)可。如更換人員,乙方應(yīng)及時(shí)書(shū)面通知甲方。
12.7 乙方應(yīng)當(dāng)提交說(shuō)明書(shū)、保修單、環(huán)保說(shuō)明書(shū)和購(gòu)貨發(fā)票復(fù)印件,甲方要求與原件核對(duì)的,乙方應(yīng)當(dāng)同意。發(fā)票上應(yīng)當(dāng)載明產(chǎn)品名稱、品牌、型號(hào)、規(guī)格、等級(jí)、價(jià)格和數(shù)量。
第十三條 工程變更
工程項(xiàng)目或施工方式如需變更,雙方應(yīng)協(xié)商一致,簽訂書(shū)面變更協(xié)議,同時(shí)調(diào)整相關(guān)工程費(fèi)用及工期(見(jiàn)附表七:裝飾裝修工程變更單)。
第十四條 工期延誤
14.1 對(duì)以下原因造成竣工日期延誤,經(jīng)甲方確認(rèn),工期相應(yīng)順延:
(1)工程量變化或設(shè)計(jì)變更;
(2)不可抗力;
(3)甲方同意工期順延的其他情況。
14.2 因甲方未按合同約定完成其應(yīng)負(fù)責(zé)的工作而影響工期的,工期順延;因甲方提供的材料、設(shè)備質(zhì)量不合格而影響工程質(zhì)量的,返工費(fèi)用由甲方承擔(dān),工期順延。
14.3 甲方未按期支付工程款,合同工期相應(yīng)順延。
14.4 因乙方責(zé)任不能按期完工,工期不順延;因乙方原因造成工程質(zhì)量存在問(wèn)題的,返工費(fèi)用由乙方承擔(dān),工期不順延。
第十五條 違約責(zé)任
15.1 合同雙方當(dāng)事人中的任一方因未履行合同的約定或違反國(guó)家法律、法規(guī)及有關(guān)政策規(guī)定,受到罰款或給對(duì)方造成經(jīng)濟(jì)損失均由責(zé)任方承擔(dān)責(zé)任,并賠償給對(duì)方造成的經(jīng)濟(jì)損失;
15.2 未辦理驗(yàn)收手續(xù),甲方提前使用或擅自動(dòng)用工程成品而造成損失的,由甲方負(fù)責(zé);
15.3 因一方原因,造成合同無(wú)法繼續(xù)履行時(shí),該方應(yīng)及時(shí)通知另一方,辦理合同終止手續(xù),并由責(zé)任方賠償對(duì)方相應(yīng)的經(jīng)濟(jì)損失;
15.4 由于甲方原因?qū)е卵悠陂_(kāi)工或中途停工,甲方應(yīng)補(bǔ)償乙方因停工、窩工所造成的損失,每停工或窩工一天,甲方付乙方_________元;甲方未按合同的約定付款的,每逾期一天,按逾期未付款的_________%支付違約金。
15.5 由于乙方原因,工程質(zhì)量達(dá)不到雙方約定的質(zhì)量標(biāo)準(zhǔn),乙方負(fù)責(zé)修理,工期不予順延;
15.6 由于乙方原因逾期竣工的,每逾期一天,乙方按甲方已付款的_________%向甲方支付違約金。
15.7 甲方未辦理有關(guān)手續(xù),強(qiáng)行要求乙方拆改原有建筑承重結(jié)構(gòu)及共用設(shè)備管線,由此發(fā)生的損失或事故(包括罰款)由甲方負(fù)責(zé)并擔(dān)責(zé)任。
15.8 乙方擅自拆改原有建筑承重結(jié)構(gòu)或共用設(shè)備管線,由此發(fā)生的損失或事故(包括罰款),由乙方負(fù)責(zé)并承擔(dān)責(zé)任。
第十六條 合同的變更和解除
16.1 合同經(jīng)雙方簽字(在有形市場(chǎng)簽訂的合同須經(jīng)市場(chǎng)管理部門(mén)蓋章見(jiàn)證)生效后,雙方必須嚴(yán)格遵守。任何一方需變更合同內(nèi)容,應(yīng)經(jīng)協(xié)商一致后,重新簽訂補(bǔ)充協(xié)議。如要終止合同,提出終止合同一方,要以書(shū)面形式提出,應(yīng)按合同總價(jià)款_________%支付違約金,并辦理終止合同手續(xù)。
16.2 施工過(guò)程中任何一方提出終止合同,須向另一方以書(shū)面形式提出,經(jīng)雙方同意辦理清算手續(xù),訂立終止合同協(xié)議,可視為本合同解除。
第十七條 垃圾清運(yùn)
因工程施工而產(chǎn)生的垃圾,由乙方負(fù)責(zé)運(yùn)出施工現(xiàn)場(chǎng),并負(fù)責(zé)將垃圾運(yùn)到指定的_________地點(diǎn),甲方負(fù)責(zé)支付垃圾清運(yùn)費(fèi)用(人民幣)_________元(此費(fèi)用不在工程價(jià)款內(nèi))。
第十八條 聲明及保證
甲方:
18.1 甲方為一家依法設(shè)立并合法存續(xù)的企業(yè),有權(quán)簽署并有能力履行本合同。
18.2 甲方簽署和履行本合同所需的一切手續(xù)均已辦妥并合法有效。
18.3 在簽署本合同時(shí),任何法院、仲裁機(jī)構(gòu)、行政機(jī)關(guān)或監(jiān)管機(jī)構(gòu)均未作出任何足以對(duì)甲方履行本合同產(chǎn)生重大不利影響的判決、裁定、裁決或具體行政行為。
18.4 甲方為簽署本合同所需的內(nèi)部授權(quán)程序均已完成,本合同的簽署人是甲方的法定代表人或授權(quán)代表人。本合同生效后即對(duì)合同雙方具有法律約束力。
乙方:
18.1 乙方為一家依法設(shè)立并合法存續(xù)的企業(yè),有權(quán)簽署并有能力履行本合同。
18.2 乙方簽署和履行本合同所需的一切手續(xù)均已辦妥并合法有效。
18.3 在簽署本合同時(shí),任何法院、仲裁機(jī)構(gòu)、行政機(jī)關(guān)或監(jiān)管機(jī)構(gòu)均未作出任何足以對(duì)乙方履行本合同產(chǎn)生重大不利影響的判決、裁定、裁決或具體行政行為。
18.4 乙方為簽署本合同所需的內(nèi)部授權(quán)程序均已完成,本合同的簽署人是乙方的法定代表人或授權(quán)代表人。本合同生效后即對(duì)合同雙方具有法律約束力。
第十九條 保密
雙方保證對(duì)從另一方取得且無(wú)法自公開(kāi)渠道獲得的商業(yè)秘密(技術(shù)信息、經(jīng)營(yíng)信息及其他商業(yè)秘密)予以保密。未經(jīng)該商業(yè)秘密的原提供方同意,一方不得向任何第三方泄露該商業(yè)秘密的全部或部分內(nèi)容。但法律、法規(guī)另有規(guī)定或雙方另有約定的除外。保密期限為_(kāi)________年。
一方違反上述保密義務(wù)的,應(yīng)承擔(dān)相應(yīng)的違約責(zé)任并賠償由此造成的損失。
第二十條 不可抗力
本合同所稱不可抗力是指不能預(yù)見(jiàn)、不能克服、不能避免并對(duì)一方當(dāng)事人造成重大影響的客觀事件,包括但不限于自然災(zāi)害如洪水、地震、火災(zāi)和風(fēng)暴等以及社會(huì)事件如戰(zhàn)爭(zhēng)、動(dòng)亂、政府行為等。
如因不可抗力事件的發(fā)生導(dǎo)致合同無(wú)法履行時(shí),遇不可抗力的一方應(yīng)立即將事故情況書(shū)面告知另一方,并應(yīng)在_________天內(nèi),提供事故詳情及合同不能履行或者需要延期履行的書(shū)面資料,雙方認(rèn)可后協(xié)商終止合同或暫時(shí)延遲合同的履行。
第二十一條 通知
21.1 根據(jù)本合同需要發(fā)出的全部通知以及雙方的文件往來(lái)及與本合同有關(guān)的通知和要求等,必須用書(shū)面形式,可采用_________(書(shū)信、傳真、電報(bào)、當(dāng)面送交等方式)傳遞。以上方式無(wú)法送達(dá)的,方可采取公告送達(dá)的方式。
21.2 各方通訊地址如下:_________。
21.3 一方變更通知或通訊地址,應(yīng)自變更之日起_________日內(nèi),以書(shū)面形式通知對(duì)方;否則,由未通知方承擔(dān)由此而引起的相應(yīng)責(zé)任。
第二十二條 爭(zhēng)議的處理
22.1 本合同受_________國(guó)法律管轄并按其進(jìn)行解釋。
22.2 本合同在履行過(guò)程中發(fā)生的爭(zhēng)議,由雙方當(dāng)事人協(xié)商解決,也可由有關(guān)部門(mén)調(diào)解;協(xié)商或調(diào)解不成的,按下列第_________種方式解決:
(1)提交_________仲裁委員會(huì)仲裁;
(2)依法向人民法院起訴。
第二十三條 解釋
本合同的理解與解釋?xiě)?yīng)依據(jù)合同目的和文本原義進(jìn)行,本合同的標(biāo)題僅是為了閱讀方便而設(shè),不應(yīng)影響本合同的解釋。
第二十四條 補(bǔ)充與附件
本合同未盡事宜,依照有關(guān)法律、法規(guī)執(zhí)行,法律、法規(guī)未作規(guī)定的,甲乙雙方可以達(dá)成書(shū)面補(bǔ)充協(xié)議。本合同的附件和補(bǔ)充合同均為本合同不可分割的組成部分,與本合同具有同等的法律效力。
第二十五條 合同效力
本合同自雙方或雙方法定代表人或其授權(quán)代表人簽字并加蓋公章之日起生效。有效期為_(kāi)________年,自_________年_________月_________日至_________年_________月_________日。本合同正本一式_________份,雙方各執(zhí)_________份,具有同等法律效力;合同副本_________份,送_________留存一份。
甲方(蓋章):_________ 乙方(蓋章):_________
委托人(簽字):_________ 法定代表人(簽字):_________
_________年____月____日 _________年____月____日
熱門(mén)標(biāo)簽
家裝培訓(xùn)總結(jié) 家裝設(shè)計(jì) 家裝施工總結(jié) 家裝 心理培訓(xùn) 人文科學(xué)概論